Default Installing a smartboard at Penn State tomorrow

Mounting board and projector, fishing wires, etc...

It's been a while since I've been to happy valley




http://www.smarttech.com/us/Solution...+for+education

zwodubber is online now   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 09-27-2011, 10:07 PM   #2
cog
 
stuiec's Avatar
 
Join Date: Sep 2010
Location: cana-duh
Posts: 2,996
Default

wow. That one looks way easier than the ones we did. Then again, they were in portable additions to the school (all wiremold), and they had the ceiling mounted projectors. That one looks like a snap! Good $$?

stuiec is offline   Reply With Quote
Old 09-27-2011, 10:16 PM   #3
Senior Member
 
zwodubber's Avatar
 
Join Date: Feb 2011
Location: PA
Posts: 1,734
Default

Quote:
Originally Posted by stuiec View Post
wow. That one looks way easier than the ones we did. Then again, they were in portable additions to the school (all wiremold), and they had the ceiling mounted projectors. That one looks like a snap! Good $$?
Yeah they have come a long way, this is my first one of this style. The install should be pretty straightforward, it's the software I'm looking forward to. I love doing full installs.
zwodubber is online now   Reply With Quote
Old 09-27-2011, 10:19 PM   #4
cog
 
stuiec's Avatar
 
Join Date: Sep 2010
Location: cana-duh
Posts: 2,996
Default

Quote:
Originally Posted by zwodubber View Post
Yeah they have come a long way, this is my first one of this style. The install should be pretty straightforward, it's the software I'm looking forward to. I love doing full installs.

I've only ever installed the hardware and run cables. What is the software setup like? Whats involved?
stuiec is offline   Reply With Quote
Old 09-27-2011, 10:27 PM   #5
Senior Member
 
zwodubber's Avatar
 
Join Date: Feb 2011
Location: PA
Posts: 1,734
Default

Quote:
Originally Posted by stuiec View Post
I've only ever installed the hardware and run cables. What is the software setup like? Whats involved?

It's not bad, I did IT for years before switching over. As long as the hardware is correctly installed it's like installing Microsoft Office (OK, maybe a little more in depth). But it's really not bad, I just happen to still like jobs where I get to do this kind of thing.
zwodubber is online now   Reply With Quote
The Following User Says Thank You to zwodubber For This Useful Post:
stuiec (09-27-2011)
Old 09-28-2011, 05:13 PM   #6
Senior Member
 
zwodubber's Avatar
 
Join Date: Feb 2011
Location: PA
Posts: 1,734
Default

Woke up at 4 am and we were on the road at 5 for Penn State. 3 hours later we arrive.





It's not until we get there that I find out we are installing the boards at the Air operations squadron for the National Guard, not the University.

Pulling up to the first gate

Force protection condition Alpha





2 gates later we are heading in





Now as soon as you enter everyone is in fatigues, and we are greeted as non authorized guests and escorted in. We actually had two units to mount which again was news to me.

We start on the first floor which is pretty loose and everyone is really polite and helpful. We get the board up and tested and are now ready to go to the second floor for the second board.

Now things are a little different... as we get to the top of the stairs we are told to leave all communication devices in a bin. General hits intercom and announces non authorized guests entering. Red lights start flashing on the walls notifying everyone we are there and to basically not talk "business" while we are there. We are escorted to the room with the new smartboard and a soldier grabs a chair and sits about ten feet from us for the install. We got the board mounted and I headed back downstairs to do the software setup while my co worker finished up the second floor install. Phones are allowed downstairs and I was allowed a picture of the board (it's a little blurry because I didn't want to take to long).





I head back up and go through the same process, then set up the software on board 2.

All in all it was a cool experience and everyone was cool and interested in what we were doing.

The boards had to be calibrated and then allowed full touchscreen capabilities, pretty cool tech.
zwodubber is online now   Reply With Quote
The Following User Says Thank You to zwodubber For This Useful Post:
stuiec (09-28-2011)
Old 09-28-2011, 06:37 PM   #7
Senior Member
 
goose134's Avatar
 
Join Date: Nov 2007
Location: Chicago
Posts: 1,037
Default

Nice install. I did one of those where the whole assembly could slide up and down to accommodate presenters in wheelchairs. Those smart boards are pretty incredible.
__________________
A professional in an amateur world.
goose134 is offline   Reply With Quote
The Following User Says Thank You to goose134 For This Useful Post:
zwodubber (09-28-2011)
Old 09-28-2011, 11:30 PM   #8
Junior Member
 
AVARCHITECH's Avatar
 
Join Date: Sep 2011
Location: United States
Posts: 5
Send a message via Skype™ to AVARCHITECH
Default

These things are really nice. I've been using the Hitachi smartboards and like them. Easy to install after you've done one or two and integrate easily with crestron.

__________________
Ron
www.audiovideoarchitech.com
AVARCHITECH is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
It's over tomorrow RIVETER Off Topic 2 05-20-2011 08:54 PM
state to state requirements redrockerntx General Electrical Discussion 3 04-15-2011 12:54 AM
Penn and Teller brian john Off Topic 7 06-12-2010 06:18 PM
Help Tomorrow Piz Union Topics 11 04-27-2010 09:39 PM
Student Electrician Needs Help @ Penn Foster imperialarcher Site Help and Suggestions 14 04-28-2009 10:25 PM

Top of Page | View New Posts

All times are GMT -4. The time now is 09:23 PM.


Electrician Talk © 2006 - 2010 The Building Network

Search Engine Optimization by vBSEO 3.6.0 RC 2