for the electrician union...(waiting list ?) - Electrician Talk - Professional Electrical Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY, IT'S FREE!
Go Back   Electrician Talk - Professional Electrical Contractors Forum > Electrical Trade Topics > Union Topics


Reply
 
Thread Tools Display Modes
Old 01-21-2013, 11:40 AM   #1
Junior Member
 
Join Date: Jan 2013
Location: ohio
Posts: 1
Rewards Points: 10
Default for the electrician union...(waiting list ?)

I got put on the electrician union waiting list in July of 2012. so its been about 7 months now. So how often does the electrician union pick people for an apprenticeship? and just an FYI its for the one in akron ohio local 306 and I hot an 86 on my interview.
shucampbell is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 01-21-2013, 12:47 PM   #2
Senior Member
 
drumnut08's Avatar
 
Join Date: Sep 2012
Location: New jersey
Posts: 2,559
Rewards Points: 1,012
Default

Quote:
Originally Posted by shucampbell
I got put on the electrician union waiting list in July of 2012. so its been about 7 months now. So how often does the electrician union pick people for an apprenticeship? and just an FYI its for the one in akron ohio local 306 and I hot an 86 on my interview.
Well , if you don't like the "waiting game " , the union may not be the move for you . Unfortunately IBEW locals all over the country are still predominantly slow causing many good qualified electricians to be waiting for the call back to work . Sad but true . Not sure how local 306 Is fairing , but if I had to guess , slow too , or you would have heard something by now . Apprentice intake is directly proportionate to the current workload and guys retiring . If both are slow , no need to hire new apprentices . Hang in there and good luck , with whatever path you choose !
drumnut08 is offline   Reply With Quote
Old 01-21-2013, 01:18 PM   #3
Member
 
Join Date: Jan 2008
Location: mantorville mn
Posts: 57
Rewards Points: 81
Default

I would call the local and talk to the training director if they have one to find out how long the wait might be. Ask about any summer help programs they might have, it would be a way to get your foot in the door and prove what that you are worth hiring. 17 years ago when I applied I was in the second level of hires, not guaranteed to get a job but if they needed extras I would be called. After waiting 6 weeks I called about any type of work that might get my foot in the door, the only thing they had was 3.5 hours away, I declined. A week later I got a call offering me a job 15 minutes from home at a great company. I don't know for sure if the call I made a week earlier helped but I know it didn't hurt.
heavyduty73 is offline   Reply With Quote
Old 01-21-2013, 01:52 PM   #4
Junior Member
 
Join Date: Oct 2012
Location: Cali
Posts: 4
Rewards Points: 10
Default

I've been on the waiting list in Sacramento, CA for about 4 months. I scored a 98.75% on my interview and I called a few weeks ago to ask where I was on the list and they said they couldn't tell me because it changes all the time. They said they only accept scores over 95%. My recommendation would be to complete the qualifying conditions so you can interview again and hopefully score higher.
Bbrayca is offline   Reply With Quote
Old 01-22-2013, 10:38 PM   #5
Junior Member
 
Join Date: Mar 2009
Location: Richfield, MN
Posts: 25
Rewards Points: 10
Default

I waited on the list to get into the apprenticeship for 3 years, I had to re-interview after 2 years. I worked non-union while I waited, once I did get in the owner of the non-union shop signed off on my hours, giving me "previous experience" credit. Giving me a pay raise a year ahead of others in my class.

I know my local didn't hire apprentices from fall of 2008 until the summer of 2011. At one point there were 150 apprentice out of work. Currently the waiting list is clear, and 10 apprentices are out of work.

Call the Hall or JATC, who ever takes care of hiring apprentices for the local, and ask what number you are on the waiting list, ask how many are on the waiting list, how many apprentices are out of work, and if they have a general idea how long it will be before the hire.
Sliver is offline   Reply With Quote
Old 07-24-2013, 09:52 PM   #6
Junior Member
 
Join Date: May 2013
Location: washington
Posts: 2
Rewards Points: 10
Default

Thinking about traveling, anyone know if any unions are taking men from book 2
karran is offline   Reply With Quote
Old 07-24-2013, 10:00 PM   #7
Senior Member
 
erics37's Avatar
 
Join Date: May 2009
Location: Depoe Bay, Oregon
Posts: 12,991
Rewards Points: 640
Default

Quote:
Originally Posted by karran View Post
Thinking about traveling, anyone know if any unions are taking men from book 2
I hear Local 48 will be dispatching a buttload of hands to the Intel site soon. Like 700 or more. A friend of mine signed book 2 there last week and he was #400-something.
__________________
I was assimilated by the Borg and all I got was this stupid t-shirt.
erics37 is offline   Reply With Quote
Old 07-27-2013, 12:02 PM   #8
Junior Member
 
Join Date: May 2013
Location: washington
Posts: 2
Rewards Points: 10
Default

thanks for th e information..I'll check it out
karran is offline   Reply With Quote
Old 07-31-2013, 12:11 PM   #9
Senior Member
 
Join Date: Mar 2012
Location: Oregon
Posts: 678
Rewards Points: 594
Default

Quote:
Originally Posted by karran View Post
thanks for th e information..I'll check it out


I'm working out of 48 at Intel. There have been big layoffs lately, so its not exactly a walkthrough at the moment because all those book 1 hands are coming right back out and taking all the available calls. Same job, different name on the hard hat. It should get to be a walkthrough at some point though
jimmy21 is offline   Reply With Quote
Old 07-31-2013, 08:23 PM   #10
Member
 
cwsims84's Avatar
 
Join Date: Jan 2012
Location: Oregon
Posts: 84
Rewards Points: 75
Default

Quote:
Originally Posted by erics37 View Post
I hear Local 48 will be dispatching a buttload of hands to the Intel site soon. Like 700 or more. A friend of mine signed book 2 there last week and he was #400-something.
Ive been at Intel for about 2months now.. Im not sure that 700 apprentices would be accurate. I am one of only two with my company right now and we have a pretty huge site. I have been told that it will be about 5mo before they really start getting heavy with guys and even then we will only be at about 60 total. Maybe EC or Oregon Electric will get apprentice heavy, but with all the rules we have to follow and the strictness, I have heard that most EC's are sticking to Journeyman
cwsims84 is offline   Reply With Quote
Old 08-07-2013, 12:50 PM   #11
Member
 
wirediron28's Avatar
 
Join Date: Jul 2013
Location: Portland, Or
Posts: 55
Rewards Points: 75
Default

Any word on how long intel will be continuing? 2yrs 3? 5?
wirediron28 is offline   Reply With Quote
Old 08-07-2013, 11:16 PM   #12
Senior Member
 
erics37's Avatar
 
Join Date: May 2009
Location: Depoe Bay, Oregon
Posts: 12,991
Rewards Points: 640
Default

Quote:
Originally Posted by cwsims84 View Post
Ive been at Intel for about 2months now.. Im not sure that 700 apprentices would be accurate. I am one of only two with my company right now and we have a pretty huge site. I have been told that it will be about 5mo before they really start getting heavy with guys and even then we will only be at about 60 total. Maybe EC or Oregon Electric will get apprentice heavy, but with all the rules we have to follow and the strictness, I have heard that most EC's are sticking to Journeyman
I didn't say 700 apprentices, I meant 700 book 1 & 2 hands.

Thanks for the info though
__________________
I was assimilated by the Borg and all I got was this stupid t-shirt.
erics37 is offline   Reply With Quote
Old 08-07-2013, 11:20 PM   #13
Senior Member
 
erics37's Avatar
 
Join Date: May 2009
Location: Depoe Bay, Oregon
Posts: 12,991
Rewards Points: 640
Default

Quote:
Originally Posted by wirediron28 View Post
Any word on how long intel will be continuing? 2yrs 3? 5?
No clue.

Out here in Local 932 we're crossing our fingers for the Jordan Cove project to get rolling (LNG export terminal facility). They're slowly but surely getting all their permits and approvals and stuff but there's a lot of bureaucratic red tape to wade through. What I understand from our BM is that it would keep somewhere around 400 Jmen working steady for several years, with the occasional upswing. That would put every book 1 and Book 2 name in this local to work, and we would need to dig up a bunch more people from outside the jurisdiction.

But it's a few years out yet. I believe the estimated price tag for the project is $7.5 billion. It includes the liquefaction facility, the import/export terminal, and a 420 MW power plant dedicated to the facility. Also includes an interstate pipeline.
__________________
I was assimilated by the Borg and all I got was this stupid t-shirt.

Last edited by erics37; 08-07-2013 at 11:26 PM.
erics37 is offline   Reply With Quote
Old 12-07-2013, 03:50 PM   #14
Junior Member
 
CurtPDX's Avatar
 
Join Date: Dec 2012
Location: OR/WA
Posts: 6
Rewards Points: 10
Default

[quote=wirediron28;1071284]Any word on how long intel will be continuing? 2yrs 3? 5?[/quote

Intel will be going for a long, long time....they still have Mod 3 to do (mod 2 was for 2.5 yrs i think?), and don't forget all the upgrading and re-tooling.
Kulongoski just made the same tax deal with Intel that OR made with Nike, so Intel is now planning more expansions.
CurtPDX is offline   Reply With Quote
The Following User Says Thank You to CurtPDX For This Useful Post:
360max (12-07-2013)
Old 12-29-2013, 05:13 AM   #15
Junior Member
 
KMo2010's Avatar
 
Join Date: Dec 2013
Location: New Mexico
Posts: 8
Rewards Points: 10
Default

Quote:
Originally Posted by Bbrayca
I've been on the waiting list in Sacramento, CA for about 4 months. I scored a 98.75% on my interview and I called a few weeks ago to ask where I was on the list and they said they couldn't tell me because it changes all the time. They said they only accept scores over 95%. My recommendation would be to complete the qualifying conditions so you can interview again and hopefully score higher.
Have you been called yet?
KMo2010 is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
The Union plumbers union electrician Shockdoc General Electrical Discussion 2 08-16-2011 06:17 PM
Should I Become Non-Union Electrician? Donald11 Union Topics 94 08-19-2010 07:17 PM
Whats it like being a union electrician? guvnor Union Topics 138 10-01-2009 08:26 AM
Is it worth it to be a Union Electrician? Porsche650 Union Topics 43 09-01-2009 03:33 PM
Los Angeles Apprentice waiting list....... N2wires Union Topics 1 12-05-2008 06:00 AM


All times are GMT -4. The time now is 01:23 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2017, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com