Electrician Talk - Professional Electrical Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Electrician Talk - Professional Electrical Contractors Forum > Electrical Trade Topics > Commercial Electrical Forum

Reply
 
Thread Tools Search this Thread Display Modes
Old 04-18-2012, 09:46 PM   #1
Junior Member
 
Join Date: Apr 2012
Location: Georgia
Posts: 1
Default Dermatology office bid

Can anyone give me an idea of how to price labor on a 2,200 sq.ft 400 amp single phase dermatology office. I have never done one with my own business. It is basic exam rooms,office area, 2 bathrooms, one ac system, and only a couple outdoor wall packs. Has anyone done something similar lately. Figured I throw out a high price to cover me and see if I get it.

meyer_electric is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 04-19-2012, 07:16 AM   #2
Moderator
 
Dennis Alwon's Avatar
 
Join Date: May 2009
Location: Chapel Hill, NC
Posts: 12,249
Default

Welcome to the forum. It would be very hard to bid a job based on the info given

__________________
Dennis Alwon is online now   Reply With Quote
Old 04-19-2012, 07:43 AM   #3
Senior Member
 
Join Date: Mar 2012
Location: Colorado
Posts: 225
Default

I hate to be a smart a$$ but if you need to ask you are not ready to do that job!
JHFWIC is offline   Reply With Quote
Old 04-19-2012, 07:47 AM   #4
Heavily Armed Member
 
HARRY304E's Avatar
 
Join Date: Sep 2010
Location: Fascistchusetts
Posts: 30,234
Default

Quote:
Originally Posted by meyer_electric View Post
Can anyone give me an idea of how to price labor on a 2,200 sq.ft 400 amp single phase dermatology office. I have never done one with my own business. It is basic exam rooms,office area, 2 bathrooms, one ac system, and only a couple outdoor wall packs. Has anyone done something similar lately. Figured I throw out a high price to cover me and see if I get it.
Keep in mind that Article 517 may apply to that job as well.

The number of guys you are going to put on the job as well.

Welcome to ET.....
HARRY304E is online now   Reply With Quote
Old 04-19-2012, 07:51 AM   #5
Heavily Armed Member
 
HARRY304E's Avatar
 
Join Date: Sep 2010
Location: Fascistchusetts
Posts: 30,234
Default

Quote:
Originally Posted by JHFWIC View Post
I hate to be a smart a$$ but if you need to ask you are not ready to do that job!
He may be just posting a question that he knows the answer to but just wanted to post something to break the ice it is his first post...
HARRY304E is online now   Reply With Quote
Old 04-19-2012, 12:37 PM   #6
Anti Political
 
Join Date: May 2007
Location: The land of no concealed carry
Posts: 1,780
Default

Quote:
Originally Posted by meyer_electric View Post
Can anyone give me an idea of how to price labor on a 2,200 sq.ft 400 amp single phase dermatology office. I have never done one with my own business. It is basic exam rooms,office area, 2 bathrooms, one ac system, and only a couple outdoor wall packs. Has anyone done something similar lately. Figured I throw out a high price to cover me and see if I get it.

If you "throw" a high price at it you will not get it.

Plus, if you do, how will you know you will make money. You have no basis.

What you have to do, is do a detailed take off, and build an estimate from that.

Figure out what material you will use to build the job. Each piece of material has a material cost and a labor component.

Add all this up for a total of material and labor hours.

Factor if necessary.

Multiply your take off hours times your hourly rate.

Figure out job costs, permitting, saw cut, lifts, truck, deliveries, etc.

Add overhead

Add profit

So you should have something like this on a summary sheet: (not real numbers - just an example)

Material 10,000
Material tax 1,000
Labor 35,000
DJC 1,200
OH 7,000
P 7,500

Total $61,700
mdfriday is offline   Reply With Quote
The Following User Says Thank You to mdfriday For This Useful Post:
nitro71 (04-19-2012)
Old 04-19-2012, 12:39 PM   #7
Anti Political
 
Join Date: May 2007
Location: The land of no concealed carry
Posts: 1,780
Default

Quote:
Originally Posted by Dennis Alwon View Post
Welcome to the forum. It would be very hard to bid a job based on the info given
Quote:
Originally Posted by JHFWIC View Post
I hate to be a smart a$$ but if you need to ask you are not ready to do that job!

He is asking how to do it. Not what it should be....
mdfriday is offline   Reply With Quote
Old 04-19-2012, 02:56 PM   #8
Registered Member
 
Join Date: Aug 2010
Location: georgia
Posts: 9,491
Default $

I came up with $37,480.02
Cletis is offline   Reply With Quote
Old 04-19-2012, 11:52 PM   #9
Senile Member
 
macmikeman's Avatar
 
Join Date: Jan 2007
Location: Honolulu
Posts: 7,672
Default

Don't do a handshake deal, you might catch something....
__________________
Try reading this guy's story- http://www.guardian.co.uk/world/2013...rd-snowden-why
There is your true American.
macmikeman is offline   Reply With Quote
Old 04-19-2012, 11:55 PM   #10
not a union thug
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 7,135
Default

Quote:
Originally Posted by JHFWIC View Post
I hate to be a smart a$$ but if you need to ask you are not ready to do that job!
I don't think that's really true.
electricmanscott is offline   Reply With Quote
Old 04-19-2012, 11:57 PM   #11
not a union thug
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 7,135
Default

Quote:
Originally Posted by mdfriday View Post
Material 10,000
Material tax 1,000
Labor 35,000
DJC 1,200
OH 7,000
P 7,500

Total $61,700

Thief!!


Quote:
Originally Posted by Cletis View Post
I came up with $37,480.02
Lowball hack!!

electricmanscott is offline   Reply With Quote
The Following User Says Thank You to electricmanscott For This Useful Post:
Awg-Dawg (04-20-2012)
Old 04-20-2012, 12:00 AM   #12
Senior Member
 
360max's Avatar
 
Join Date: Jun 2011
Location: NY
Posts: 3,994
Default

Quote:
Originally Posted by electricmanscott View Post
Thief!!




Lowball hack!!

360max is offline   Reply With Quote
Old 04-20-2012, 07:59 AM   #13
Exasperating Member
 
JohnR's Avatar
 
Join Date: Apr 2010
Location: Central CT US of A
Posts: 2,225
Default

Just don't say, Yo' brotha gimme some skin.
JohnR is offline   Reply With Quote
Old 04-24-2012, 10:34 PM   #14
Junior Member
 
electrikalwizrd's Avatar
 
Join Date: Apr 2012
Location: sc
Posts: 8
Default

you can check rsmeans website and get a national average cost per sq ft for that particular type of commercial building if you want a high price, sounds like you need to hire an estimator my man.

electrikalwizrd is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Pediatrician office Wedoitwithoutshorts Commercial Electrical Forum 10 04-12-2012 09:40 PM
office manager - office assistant 1joeyj Business, Marketing, and Sales 9 11-25-2011 10:48 PM
Generator in office WarrickF General Electrical Discussion 3 07-29-2011 03:16 PM
Office outlets iamcarbman NEC Code Forum 8 04-01-2010 03:45 PM
Just another day at the office RIVETER General Electrical Discussion 37 03-21-2010 09:38 PM

Top of Page | View New Posts

All times are GMT -4. The time now is 05:32 PM.


Electrician Talk © 2006 - 2010 The Building Network

Search Engine Optimization by vBSEO 3.6.0 RC 2