I have a 2megawatt 480 load bank used for generator testing. I need to size a transformer so I can test 4160 volt. The normal way would use a 2500 kva transformer. I plan to make it portable. I need to get the weight down as much as posiblle. I have tested using a 2500 kva and there is no temp rise with the transformer. The duty cycle will be no more than 5 hours. my thought would be down size and lose weight to make it more portable. What are your thoughts. Thanks
|
|
|
Join the #1 Electrician Forum Today - It's Totally Free!
ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!
Join ElectricianTalk.com - Click Here

|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
05-04-2012, 02:56 AM
|
#2
|
|
Senior Member
Join Date: Feb 2007
Location: Eighty Four,Pa.15330
Posts: 5,534
|
Quote:
Originally Posted by Generator51
I have a 2megawatt 480 load bank used for generator testing. I need to size a transformer so I can test 4160 volt. The normal way would use a 2500 kva transformer. I plan to make it portable. I need to get the weight down as much as posiblle. I have tested using a 2500 kva and there is no temp rise with the transformer. The duty cycle will be no more than 5 hours. my thought would be down size and lose weight to make it more portable. What are your thoughts. Thanks
|
I would sub it out,rather than getting into all that cabling and terminations
|
|
|
05-04-2012, 10:36 PM
|
#3
|
|
Junior Member
Join Date: May 2012
Location: calif
Posts: 5
|
I am the sub the is doing this work. The 4160 side does not have that much wiring. I just don't think you need a full size transformer for just a short duty cycle Thanks
|
|
|
05-05-2012, 10:14 AM
|
#4
|
|
Senior Member
Join Date: Nov 2010
Location: New England
Posts: 23,964
|
Quote:
Originally Posted by Generator51
I am the sub the is doing this work. The 4160 side does not have that much wiring. I just don't think you need a full size transformer for just a short duty cycle Thanks
|
I think if you contact a major transformer manufacturer they could help you with this.
Power companies regular 'overload' transformers knowing that the length of the overload will not overheat the transformer.
You could also ask about using forced cooling with fans or maybe even water.
|
|
|
|
The Following User Says Thank You to BBQ For This Useful Post:
|
|
05-05-2012, 11:07 AM
|
#5
|
|
Senior Member
Join Date: Mar 2007
Location: Leesburg, VA
Posts: 20,449
|
Quote:
Originally Posted by bobelectric
I would sub it out,rather than getting into all that cabling and terminations
|
Bob, all that is part of doing load test.
__________________
Brian John
Leesburg, VA
|
|
|
05-05-2012, 11:08 AM
|
#6
|
|
Senior Member
Join Date: Mar 2007
Location: Leesburg, VA
Posts: 20,449
|
Are you using a dry type or oiled filled?
__________________
Brian John
Leesburg, VA
|
|
|
05-05-2012, 04:40 PM
|
#7
|
|
Junior Member
Join Date: May 2012
Location: calif
Posts: 5
|
I would like to use a oil filled. I will not use to much, so it will be easer to store. I am open to anything right now. Some of the thoughts I have are the busing in the transformer. Will they carry the short large load. I know transformers can overload. I haven't a lot of experance over loading transformers. Fan cooling is more of a long term fix. I would like to find a used transformer. Cost savings would be nice for the small amount of time I will use it. Thats why I'm here, to see if someone has some backround in this area.
|
|
|
05-05-2012, 05:44 PM
|
#8
|
|
Senior Member
Join Date: Mar 2007
Location: Leesburg, VA
Posts: 20,449
|
First what are your typical load steps and duration at each load. In a 5 hour load test you are at 100% what 1-2 hours?
http://www.usbr.gov/power/data/fist/fist1_5/vol1-5.pdf
__________________
Brian John
Leesburg, VA
Last edited by brian john; 05-06-2012 at 07:51 AM.
|
|
|
05-05-2012, 10:46 PM
|
#9
|
|
Junior Member
Join Date: May 2012
Location: calif
Posts: 5
|
Load Test starts 25% one hour,50% one hour. 75% one hour, 100% two hours. at 100% it pulls a little over 2400 amps. 480 volts
|
|
|
05-06-2012, 12:48 AM
|
#10
|
|
Wire Ninja
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 16,794
|
I'm thinking you're going to have some transportation issues to tend with if you use an oil-filled transformer. Placarding, containment, hazmat endorsement for driver, etc.
__________________
One reason not to give DIY advice:
Catch a man a fish and you can sell it to him.
Teach a man to fish and you’ve ruined a good business opportunity.
|
|
|
|
The Following User Says Thank You to MDShunk For This Useful Post:
|
|
05-06-2012, 11:36 AM
|
#11
|
|
1,000,000th Poster
Join Date: May 2010
Location: Portland
Posts: 9,485
|
That's my thinking. I would suggest a dry-type, but you've gotta have a reasonably conditioned place to store it, or else get an encapsulated style. You can't leave the thing sitting in a yard somewhere.
-John
|
|
|
05-06-2012, 12:15 PM
|
#12
|
|
Senior Member
Join Date: Mar 2007
Location: Leesburg, VA
Posts: 20,449
|
Quote:
Originally Posted by Big John
That's my thinking. I would suggest a dry-type, but you've gotta have a reasonably conditioned place to store it, or else get an encapsulated style. You can't leave the thing sitting in a yard somewhere.
-John
|
I have seen it done time and again. THOUGH NOT RECOMMENDED
Maybe two dry types on two trailers parallel them, easier to transport.
__________________
Brian John
Leesburg, VA
|
|
|
05-06-2012, 12:54 PM
|
#13
|
|
Junior Member
Join Date: May 2012
Location: calif
Posts: 5
|
I ideal way is two trailers. I'am tring to keep travel time down. I live in central California. I travel south as far as the Mexican border, north to the Calif border. You can see road time needs to be kept down. What I need to Know is how small a Transformer I can use and make it work. Like will a 1200 Kva work without damage to it. Due to duty cycle
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|