Old 04-04-2011, 04:19 PM   #1
Jesus Scott
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 9,232
Question Outdoor Hot Tub

I'm going to scope out a hot tub install. Don't have 2011 NEC handy. What's up with bonding grid requirements? The tub is sitting on pavers right now and is a new install.

__________________
Quote:
Originally Posted by 360max View Post
I wish Mayor Bloomberg would bankroll Obama, so we can get the law changed, so Obama can run for a third term.
electricmanscott is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 04-04-2011, 04:20 PM   #2
Fried Bologna um um good!
 
jwjrw's Avatar
 
Join Date: Jan 2010
Location: nc
Posts: 8,092
Default

We just run a #8 bare around them. I had one on a deck 10 feet in air.......I had to install the bonding grid in ground and run wire to tub on deck...

__________________
The more I learn the less I seem to know......

Last edited by jwjrw; 04-04-2011 at 04:31 PM.
jwjrw is offline   Reply With Quote
Old 04-04-2011, 04:20 PM   #3
child please.....
 
NolaTigaBait's Avatar
 
Join Date: Oct 2008
Location: Hack City, USA aka New Orleans
Posts: 5,294
Rewards Points: 14
Default

Trunkslammer.
__________________
REMOVED
NolaTigaBait is offline   Reply With Quote
The Following 3 Users Say Thank You to NolaTigaBait For This Useful Post:
captkirk (04-05-2011), electricmanscott (04-04-2011), Mr. Sparkle (04-04-2011)
Old 04-04-2011, 04:21 PM   #4
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 17,356
Rewards Points: 2,102
Default

Quote:
Originally Posted by electricmanscott View Post
... The tub is sitting on pavers right now and is a new install.
That's a bummer, because they make some really nice bonding grid solutions to go under pavers, before they're installed.
__________________
One reason not to give DIY advice:
Catch a man a fish and you can sell it to him.
Teach a man to fish and you’ve ruined a good business opportunity.
MDShunk is offline   Reply With Quote
Old 04-04-2011, 04:35 PM   #5
Jesus Scott
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 9,232
Default

Quote:
Originally Posted by MDShunk View Post
That's a bummer, because they make some really nice bonding grid solutions to go under pavers, before they're installed.
Yeah, I just want to be 100% sure before I break the bad news.
__________________
Quote:
Originally Posted by 360max View Post
I wish Mayor Bloomberg would bankroll Obama, so we can get the law changed, so Obama can run for a third term.
electricmanscott is offline   Reply With Quote
Old 04-04-2011, 04:39 PM   #6
Fried Bologna um um good!
 
jwjrw's Avatar
 
Join Date: Jan 2010
Location: nc
Posts: 8,092
Default

Quote:
Originally Posted by electricmanscott View Post
Yeah, I just want to be 100% sure before I break the bad news.
Read this...

(1) At least one minimum 8 AWG bare solid copper conductor
shall be provided.
(2) The conductors shall follow the contour of the perimeter
surface.
(3) Only listed splices shall be permitted.
(4) The required conductor shall be 450 mm to 600 mm
(18 in. to 24 in.) from the inside walls of the pool.
(5) The required conductor shall be secured within or under
the perimeter surface 100 mm to 150 mm (4 in. to
6 in.) below the subgrade.
__________________
The more I learn the less I seem to know......
jwjrw is offline   Reply With Quote
Old 04-04-2011, 04:48 PM   #7
Jesus Scott
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 9,232
Default

Thanks guys. I know the requirements but was concerned there may be changes for 2011 I'm not aware of.


Thanks for the help.
__________________
Quote:
Originally Posted by 360max View Post
I wish Mayor Bloomberg would bankroll Obama, so we can get the law changed, so Obama can run for a third term.
electricmanscott is offline   Reply With Quote
Old 04-04-2011, 05:09 PM   #8
That Guy
 
Mr. Sparkle's Avatar
 
Join Date: Jan 2009
Location: NJ
Posts: 3,463
Rewards Points: 2,000
Default

Quote:
Originally Posted by NolaTigaBait View Post
Trunkslammer.
Well said.

Mr. Sparkle is offline   Reply With Quote
The Following User Says Thank You to Mr. Sparkle For This Useful Post:
NolaTigaBait (04-05-2011)
Old 04-04-2011, 05:34 PM   #9
Senior Member
 
Join Date: Jul 2010
Location: IL
Posts: 2,511
Rewards Points: 1,074
Default

Reference:
680.42(B)

TIA 11-1

(SC 11-3-10/TIA Log #1005)

Pursuant to Section 5 of the NFPA Regulations Governing Committee Projects, the National Fire Protection Association has issued the following Tentative Interim Amendment to NFPA 70 ®, National Electrical Code®, 2011 edition. The TIA was processed by Panel 17 and the National Electrical Code Technical Correlating Committee, and was issued by the Standards Council on March 1, 2011, with an effective date of March 21, 2011.

A Tentative Interim Amendment is tentative because it has not been processed through the entire standards-making procedures. It is interim because it is effective only between editions of the standard. A TIA automatically becomes a proposal of the proponent for the next edition of the standard; as such, it then is subject to all of the procedures of the standards-making process.

1. Revise 680.42(B) to read as follows:
680.42(B) Bonding.
Bonding by metal-to-metal mounting on a common frame or base shall be permitted.
Exception No. 1: The metal bands or hoops used to secure wooden staves shall not be required to be bonded as required in 680.26.
Exception No. 2: A listed self-contained spa or hot tub that meets all of the following conditions shall not be required to have equipotential bonding of perimeter surfaces installed as required in 680.26(B)(2):
(1) Is installed in accordance with manufacturer’s instructions on or above grade.
(2) The vertical measurement from all permanent perimeter surfaces within 30 horizontal inches (76 cm) of the spa to the top rim of the spa is greater than 28 inches (71 cm).
Informational Note: For further information regarding the grounding and bonding requirements for self-contained spas and hot tubs, see ANSI/UL 1563 – 2009,

Standard for Electric Spas, Equipment Assemblies, and Associated Equipment.

Issue Date: March 1, 2011
Effective Date: March 21, 2011
don_resqcapt19 is offline   Reply With Quote
The Following 2 Users Say Thank You to don_resqcapt19 For This Useful Post:
davis9 (04-04-2011), jwjrw (04-05-2011)
Old 04-04-2011, 07:36 PM   #10
Senior Member
 
Join Date: Sep 2009
Location: WA
Posts: 4,064
Rewards Points: 2,000
Default

I would call your inspector and ask him if they require it. One time I called and they said they didn't care. I won't be using that as a basis for not installing one in the future but in that instance they would have passed it.
nitro71 is offline   Reply With Quote
Old 04-04-2011, 07:43 PM   #11
Inspector
 
electures's Avatar
 
Join Date: Oct 2008
Location: The Great Police State of South Jersey
Posts: 355
Rewards Points: 302
Default

Quote:
Originally Posted by jwjrw View Post
We just run a #8 bare around them. I had one on a deck 10 feet in air.......I had to install the bonding grid in ground and run wire to tub on deck...
Read this...

(1) At least one minimum 8 AWG bare solid copper conductor
shall be provided.
(2) The conductors shall follow the contour of the perimeter
surface.
(3) Only listed splices shall be permitted.
(4) The required conductor shall be 450 mm to 600 mm
(18 in. to 24 in.) from the inside walls of the pool.
(5) The required conductor shall be secured within or under
the perimeter surface 100 mm to 150 mm (4 in. to
6 in.) below the subgrade.


This means the required #8 needed to be installed in the deck framing 10 ft in the air.
electures is offline   Reply With Quote
Old 04-04-2011, 08:34 PM   #12
Fried Bologna um um good!
 
jwjrw's Avatar
 
Join Date: Jan 2010
Location: nc
Posts: 8,092
Default

Quote:
Originally Posted by electures View Post
Read this...

(1) At least one minimum 8 AWG bare solid copper conductor
shall be provided.
(2) The conductors shall follow the contour of the perimeter
surface.
(3) Only listed splices shall be permitted.
(4) The required conductor shall be 450 mm to 600 mm
(18 in. to 24 in.) from the inside walls of the pool.
(5) The required conductor shall be secured within or under
the perimeter surface 100 mm to 150 mm (4 in. to
6 in.) below the subgrade.


This means the required #8 needed to be installed in the deck framing 10 ft in the air.


Not according to the state DOI here....
__________________
The more I learn the less I seem to know......
jwjrw is offline   Reply With Quote
Old 04-04-2011, 08:42 PM   #13
Inspector
 
electures's Avatar
 
Join Date: Oct 2008
Location: The Great Police State of South Jersey
Posts: 355
Rewards Points: 302
Default

Quote:
Originally Posted by jwjrw View Post
Not according to the state DOI here....
Here in NJ the #8 has to be 4 to 6" below the subgrade which means drilled through the deck.
electures is offline   Reply With Quote
Old 04-04-2011, 11:52 PM   #14
That Guy
 
Mr. Sparkle's Avatar
 
Join Date: Jan 2009
Location: NJ
Posts: 3,463
Rewards Points: 2,000
Default

Quote:
Originally Posted by electures View Post
Read this...

(1) At least one minimum 8 AWG bare solid copper conductor
shall be provided.
(2) The conductors shall follow the contour of the perimeter
surface.
(3) Only listed splices shall be permitted.
(4) The required conductor shall be 450 mm to 600 mm
(18 in. to 24 in.) from the inside walls of the pool.
(5) The required conductor shall be secured within or under
the perimeter surface 100 mm to 150 mm (4 in. to
6 in.) below the subgrade.


This means the required #8 needed to be installed in the deck framing 10 ft in the air.
Quote:
Originally Posted by electures View Post
Here in NJ the #8 has to be 4 to 6" below the subgrade which means drilled through the deck.

The deck is not the subgrade.
Mr. Sparkle is offline   Reply With Quote
The Following 2 Users Say Thank You to Mr. Sparkle For This Useful Post:
Dennis Alwon (04-05-2011), leland (04-06-2011)
Old 04-05-2011, 12:23 AM   #15
Senior Member
 
Join Date: Oct 2007
Location: Hackettstown, NJ
Posts: 536
Rewards Points: 500
Default

Quote:
Originally Posted by electures View Post
Read this...

(1) At least one minimum 8 AWG bare solid copper conductor
shall be provided.
(2) The conductors shall follow the contour of the perimeter
surface.
(3) Only listed splices shall be permitted.
(4) The required conductor shall be 450 mm to 600 mm
(18 in. to 24 in.) from the inside walls of the pool.
(5) The required conductor shall be secured within or under
the perimeter surface 100 mm to 150 mm (4 in. to
6 in.) below the subgrade.


This means the required #8 needed to be installed in the deck framing 10 ft in the air.

Had an inspector tell me I had to SECURE the #8. He failed me for just laying it in the trench with stone dust holding it down. I had to stake the wire to the ground.
heel600 is offline   Reply With Quote
Old 04-05-2011, 07:52 AM   #16
Registered Member
 
Join Date: Jan 2008
Location: NJ
Posts: 4,431
Rewards Points: 2,000
Default

Quote:
Originally Posted by don_resqcapt19 View Post
Reference:
680.42(B)

TIA 11-1

(SC 11-3-10/TIA Log #1005)

Pursuant to Section 5 of the NFPA Regulations Governing Committee Projects, the National Fire Protection Association has issued the following Tentative Interim Amendment to NFPA 70 ®, National Electrical Code®, 2011 edition. The TIA was processed by Panel 17 and the National Electrical Code Technical Correlating Committee, and was issued by the Standards Council on March 1, 2011, with an effective date of March 21, 2011.

A Tentative Interim Amendment is tentative because it has not been processed through the entire standards-making procedures. It is interim because it is effective only between editions of the standard. A TIA automatically becomes a proposal of the proponent for the next edition of the standard; as such, it then is subject to all of the procedures of the standards-making process.

1. Revise 680.42(B) to read as follows:
680.42(B) Bonding.
Bonding by metal-to-metal mounting on a common frame or base shall be permitted.
Exception No. 1: The metal bands or hoops used to secure wooden staves shall not be required to be bonded as required in 680.26.
Exception No. 2: A listed self-contained spa or hot tub that meets all of the following conditions shall not be required to have equipotential bonding of perimeter surfaces installed as required in 680.26(B)(2):
(1) Is installed in accordance with manufacturer’s instructions on or above grade.
(2) The vertical measurement from all permanent perimeter surfaces within 30 horizontal inches (76 cm) of the spa to the top rim of the spa is greater than 28 inches (71 cm).
Informational Note: For further information regarding the grounding and bonding requirements for self-contained spas and hot tubs, see ANSI/UL 1563 – 2009,

Standard for Electric Spas, Equipment Assemblies, and Associated Equipment.

Issue Date: March 1, 2011
Effective Date: March 21, 2011
So I am going to do a hot tub next week on renovation job I finished up in the fall. The landscaper was nice enought to run me a conduit under the pavers and stub it up exactly where it needed to be. They didn't run a bond wire because the hot tub guy told them that as of last month they didn't have too.

Now I know where he got that from,too bad for him though because NJ won't be using the 2011 code until sometime in 2013

Just got off the phone with him he insists that it is effective now because it is 2011
robnj772 is offline   Reply With Quote
Old 04-05-2011, 02:16 PM   #17
Fried Bologna um um good!
 
jwjrw's Avatar
 
Join Date: Jan 2010
Location: nc
Posts: 8,092
Default

Quote:
Originally Posted by electures View Post
Here in NJ the #8 has to be 4 to 6" below the subgrade which means drilled through the deck.

4 to 6 inches below the deck is empty space. The wood decking is only 1 1/2 " thick.....According to Ron C at the NC Dept of Insurance the grid was to be installed in the ground and the bond ran up to the tub. Right or wrong that is what the DOI made us do.
__________________
The more I learn the less I seem to know......
jwjrw is offline   Reply With Quote
Old 04-05-2011, 07:10 PM   #18
Inspector
 
electures's Avatar
 
Join Date: Oct 2008
Location: The Great Police State of South Jersey
Posts: 355
Rewards Points: 302
Default

Quote:
Originally Posted by Mr. Sparkle View Post
The deck is not the subgrade.
According to the DCA here in New Jersey it is.

Last edited by electures; 04-05-2011 at 07:14 PM.
electures is offline   Reply With Quote
Old 04-05-2011, 09:38 PM   #19
That Guy
 
Mr. Sparkle's Avatar
 
Join Date: Jan 2009
Location: NJ
Posts: 3,463
Rewards Points: 2,000
Default

Quote:
Originally Posted by electures View Post
According to the DCA here in New Jersey it is.
I demand it in writing. (Not being a ballbuster, seriously I need to see how they manipulated earth and rock into what is known as a deck.)
Mr. Sparkle is offline   Reply With Quote
Old 04-06-2011, 01:18 AM   #20
NJ-IEC Member
 
Magnettica's Avatar
 
Join Date: Jan 2007
Location: Rahway, NJ
Posts: 14,163
Default

Quote:
Originally Posted by jwjrw View Post
We just run a #8 bare around them. I had one on a deck 10 feet in air.......I had to install the bonding grid in ground and run wire to tub on deck...
Seriously?

__________________
Replies based on NEC 2014
Magnettica is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
7-11 outdoor LED.. B4T General Electrical Discussion 23 11-24-2010 06:57 PM
Outdoor Hot Tub Gamit NEC Code Forum 2 08-13-2010 01:47 PM
Outdoor Spa Wiring Magnettica Code Violation Discussion 15 06-26-2010 10:14 PM
210.52(E) outdoor rec leland NEC Code Forum 35 04-04-2010 12:36 PM
Small 12-24 for outdoor JamesINla Services and Service Equipment 3 11-18-2008 01:10 AM


All times are GMT -4. The time now is 11:26 PM.


Copyright © 2006-2014 Escalate Media LP. All Rights Reserved
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com