05-01-2008, 10:40 PM
|
#1
|
|
Senior Member
Join Date: Nov 2007
Posts: 144
|
Pull box
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
|
|
|
Join the #1 Electrician Forum Today - It's Totally Free!
ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!
Join ElectricianTalk.com - Click Here

|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
05-01-2008, 10:46 PM
|
#2
|
|
Senior Member
Join Date: Jan 2007
Location: Baltimore, MD, USA
Posts: 3,490
|
Quote:
Originally Posted by subelect
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
|
No. Ask him to show you where it is - he won't be able to.
That said, on a long pull, you should do a pulling calculation - you might have to apply too much pressure to install the conductors, and damage the insulation.
Also, a pull box can make it easier. It just isn't required.
__________________
John from Baltimore
"One day at a Time"
All responses based on the '08 NEC
It's not my fault, it's not my problem, I'm not your solution. 
|
|
|
05-01-2008, 10:47 PM
|
#3
|
|
Seen your member
Join Date: Sep 2007
Location: Cornpatch USA
Posts: 9,988
|
Quote:
Originally Posted by subelect
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
|
No. You're limited only by the length of wire you can pull in.
__________________
This message is hidden because Forgery, Honda Racer, JackBoot, LawnGuyLandSparky, milehiwire and user 5941 are on your ignore list.
|
|
|
05-01-2008, 10:47 PM
|
#4
|
|
a real PITA
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
|
don't know of one myself and have never been tagged for 2 or 300 foot runs.
I did work for one guy once that did this simply because he didn;t have a fish tape long enough to run a 200 foot pull and apparently had no faith in his vacuum to suck a line.
140' ain't nothin'
|
|
|
05-01-2008, 10:49 PM
|
#5
|
|
Junior Member
Join Date: Apr 2008
Posts: 20
|
I don't think there is anything in the code book that say's you have to have a pull box at that length. I would always use as a rule of thumb a 200' long run i would set a j-box, because if i had to run a fish tape to pull wire. The fish tape is normally 200' long. But i guess it all depends on the size of conduit. Or the size of conduit that you are working on. I don't think you would want to put j-box for a feeders.
|
|
|
05-01-2008, 10:52 PM
|
#6
|
|
Senior Member
Join Date: Jan 2007
Location: Baltimore, MD, USA
Posts: 3,490
|
A bucket of jet-line is 6000', I think.
Don't know if I have a vacuum that would suck that much distance though. Or a rope that long. Or if the wire could take it.....
Done 400' once though.
__________________
John from Baltimore
"One day at a Time"
All responses based on the '08 NEC
It's not my fault, it's not my problem, I'm not your solution. 
|
|
|
05-01-2008, 10:54 PM
|
#7
|
|
Moderator
Join Date: Jan 2007
Location: NY State
Posts: 3,350
|
Quote:
Originally Posted by subelect
He mentioned that because the length is over 100', a pull box is required by the Code.
|
This is yet another an old electricians tale. I had someone tell me the same thing many years ago.
I love it when guys tell you stuff like this, yet they can never back it up. What kills me is that they actually say "It's in the code book". You'd think they'd try to look it up at least once themselves.
|
|
|
05-01-2008, 10:55 PM
|
#8
|
|
"A" inside wireman
Join Date: Sep 2007
Location: Ocean, NJ
Posts: 3,951
|
Quote:
Originally Posted by JohnJ0906
A bucket of jet-line is 6000', I think.
Don't know if I have a vacuum that would suck that much distance though.
|
There was this polish girl I met in Wisconsin, oops wrong forum
__________________
A Veteran - whether active duty, retired, guard or reserve - is someone who, at one point in his life, wrote a blank check made payable to "The United States of America," for an amount of "up to and including my life."
"One Nation Under God"
|
|
|
05-01-2008, 11:22 PM
|
#9
|
|
a real PITA
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
|
Oshkosh by chance?
|
|
|
05-02-2008, 05:06 AM
|
#10
|
|
"A" inside wireman
Join Date: Sep 2007
Location: Ocean, NJ
Posts: 3,951
|
Quote:
Originally Posted by nap
Oshkosh by chance?
|
Nope, closer to Green Bay
__________________
A Veteran - whether active duty, retired, guard or reserve - is someone who, at one point in his life, wrote a blank check made payable to "The United States of America," for an amount of "up to and including my life."
"One Nation Under God"
|
|
|
05-02-2008, 06:22 AM
|
#11
|
|
a real PITA
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
|
Quote:
Originally Posted by randomkiller
Nope, closer to Green Bay
|
apparently a different girl
|
|
|
05-02-2008, 06:50 AM
|
#12
|
|
Senior Member
Join Date: Nov 2007
Posts: 144
|
Thanks for the info, even from you Jarheads.
No, I have no problem following the boss's orders, I just like to know exactly what the Code says and requires.
It is very easy to get used to the mechanics of doing the work (bending EMT, punching the knockouts, is LTFMC cheaper than a short pc. of IMC w/ a coupler...etc) and to forget the Code reasons/rules behind what we do everyday.
Thank you again.
|
|
|
05-02-2008, 11:34 AM
|
#13
|
|
Senior Member
Join Date: Sep 2007
Location: Cocoa, FL USA
Posts: 625
|
Quote:
Originally Posted by subelect
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
|
No NEC stipulations on the maximum length of a pull.
We used to do a bit of telcom work manhole to manhole. Must be some sort of telcom standard, however our spacing was about 400 lf, 4" ducts.
Now with the advent of interstate fiber optic connections, I see quarter to half mile 2" PVC connections, PB to PB.
RK,
Following your lead, I used to work with a JW who could pull almost a 29" vacuum on a piece of 1/2" EMT, especially when talking to the boss . . . (but then, haven't we all worked with this guy?)
Work'in For That Free Tee . . .
__________________
Be Safe Out there
|
|
|
05-02-2008, 03:22 PM
|
#14
|
|
Senior Member
Join Date: Oct 2007
Location: central wisconsin
Posts: 215
|
Quote:
Originally Posted by randomkiller
Nope, closer to Green Bay
|
She moved over near Westfield after her divorce. Nice girl.
__________________
John
|
|
|
05-02-2008, 09:50 PM
|
#15
|
|
"A" inside wireman
Join Date: Sep 2007
Location: Ocean, NJ
Posts: 3,951
|
Quote:
Originally Posted by jrclen
She moved over near Westfield after her divorce. Nice girl.
|
Not much of a looker but boy can she vacuum.
__________________
A Veteran - whether active duty, retired, guard or reserve - is someone who, at one point in his life, wrote a blank check made payable to "The United States of America," for an amount of "up to and including my life."
"One Nation Under God"
|
|
|
05-02-2008, 10:20 PM
|
#16
|
|
Seen your member
Join Date: Sep 2007
Location: Cornpatch USA
Posts: 9,988
|
I've gone back through all my old Code books (back to '37) and cannot find even an old rule that has been taken out. This is one of those electricians mysteries (no splicing in panels, why '3-way' switches, etc) that defies explanation, let alone an origin.
__________________
This message is hidden because Forgery, Honda Racer, JackBoot, LawnGuyLandSparky, milehiwire and user 5941 are on your ignore list.
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|