Old 05-01-2008, 10:40 PM   #1
Senior Member
 
Join Date: Nov 2007
Posts: 144
Default Pull box

So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
subelect is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 05-01-2008, 10:46 PM   #2
Senior Member
 
JohnJ0906's Avatar
 
Join Date: Jan 2007
Location: Baltimore, MD, USA
Posts: 3,490
Default

Quote:
Originally Posted by subelect View Post
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
No. Ask him to show you where it is - he won't be able to.

That said, on a long pull, you should do a pulling calculation - you might have to apply too much pressure to install the conductors, and damage the insulation.

Also, a pull box can make it easier. It just isn't required.
__________________
John from Baltimore
"One day at a Time"
All responses based on the '08 NEC
It's not my fault, it's not my problem, I'm not your solution.
JohnJ0906 is offline   Reply With Quote
Old 05-01-2008, 10:47 PM   #3
Seen your member
 
480sparky's Avatar
 
Join Date: Sep 2007
Location: Cornpatch USA
Posts: 9,988
Default

Quote:
Originally Posted by subelect View Post
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
No. You're limited only by the length of wire you can pull in.
__________________
This message is hidden because Forgery, Honda Racer, JackBoot, LawnGuyLandSparky, milehiwire and user 5941 are on your ignore list.
480sparky is offline   Reply With Quote
Old 05-01-2008, 10:47 PM   #4
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

don't know of one myself and have never been tagged for 2 or 300 foot runs.

I did work for one guy once that did this simply because he didn;t have a fish tape long enough to run a 200 foot pull and apparently had no faith in his vacuum to suck a line.

140' ain't nothin'
nap is offline   Reply With Quote
Old 05-01-2008, 10:49 PM   #5
Junior Member
 
Join Date: Apr 2008
Posts: 20
Default

I don't think there is anything in the code book that say's you have to have a pull box at that length. I would always use as a rule of thumb a 200' long run i would set a j-box, because if i had to run a fish tape to pull wire. The fish tape is normally 200' long. But i guess it all depends on the size of conduit. Or the size of conduit that you are working on. I don't think you would want to put j-box for a feeders.
Losrod is offline   Reply With Quote
Old 05-01-2008, 10:52 PM   #6
Senior Member
 
JohnJ0906's Avatar
 
Join Date: Jan 2007
Location: Baltimore, MD, USA
Posts: 3,490
Default

A bucket of jet-line is 6000', I think.

Don't know if I have a vacuum that would suck that much distance though. Or a rope that long. Or if the wire could take it.....

Done 400' once though.
__________________
John from Baltimore
"One day at a Time"
All responses based on the '08 NEC
It's not my fault, it's not my problem, I'm not your solution.
JohnJ0906 is offline   Reply With Quote
Old 05-01-2008, 10:54 PM   #7
Moderator
 
Join Date: Jan 2007
Location: NY State
Posts: 3,350
Default

Quote:
Originally Posted by subelect View Post
He mentioned that because the length is over 100', a pull box is required by the Code.
This is yet another an old electricians tale. I had someone tell me the same thing many years ago.

I love it when guys tell you stuff like this, yet they can never back it up. What kills me is that they actually say "It's in the code book". You'd think they'd try to look it up at least once themselves.
Speedy Petey is offline   Reply With Quote
Old 05-01-2008, 10:55 PM   #8
"A" inside wireman
 
randomkiller's Avatar
 
Join Date: Sep 2007
Location: Ocean, NJ
Posts: 3,951
Send a message via Yahoo to randomkiller
Default

Quote:
Originally Posted by JohnJ0906 View Post
A bucket of jet-line is 6000', I think.

Don't know if I have a vacuum that would suck that much distance though.
There was this polish girl I met in Wisconsin, oops wrong forum
__________________
A Veteran - whether active duty, retired, guard or reserve - is someone who, at one point in his life, wrote a blank check made payable to "The United States of America," for an amount of "up to and including my life."

"One Nation Under God"
randomkiller is offline   Reply With Quote
Old 05-01-2008, 11:22 PM   #9
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

Oshkosh by chance?
nap is offline   Reply With Quote
Old 05-02-2008, 05:06 AM   #10
"A" inside wireman
 
randomkiller's Avatar
 
Join Date: Sep 2007
Location: Ocean, NJ
Posts: 3,951
Send a message via Yahoo to randomkiller
Default

Quote:
Originally Posted by nap View Post
Oshkosh by chance?

Nope, closer to Green Bay
__________________
A Veteran - whether active duty, retired, guard or reserve - is someone who, at one point in his life, wrote a blank check made payable to "The United States of America," for an amount of "up to and including my life."

"One Nation Under God"
randomkiller is offline   Reply With Quote
Old 05-02-2008, 06:22 AM   #11
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

Quote:
Originally Posted by randomkiller View Post
Nope, closer to Green Bay
apparently a different girl
nap is offline   Reply With Quote
Old 05-02-2008, 06:50 AM   #12
Senior Member
 
Join Date: Nov 2007
Posts: 144
Default

Thanks for the info, even from you Jarheads.
No, I have no problem following the boss's orders, I just like to know exactly what the Code says and requires.
It is very easy to get used to the mechanics of doing the work (bending EMT, punching the knockouts, is LTFMC cheaper than a short pc. of IMC w/ a coupler...etc) and to forget the Code reasons/rules behind what we do everyday.
Thank you again.
subelect is offline   Reply With Quote
Old 05-02-2008, 11:34 AM   #13
Senior Member
 
Join Date: Sep 2007
Location: Cocoa, FL USA
Posts: 625
Default

Quote:
Originally Posted by subelect View Post
So, today the boss and I were planning on installing a long stretch (140') of IMC horizontal across a cement wall. He mentioned that because the length is over 100', a pull box is required by the Code.
Now, I realize that you can't exceed 360 degrees between boxes and it probably is a smart idea to install a pull box on this job, but where in the Code does it require a pull box based solely on length of the run?
Thanks.
No NEC stipulations on the maximum length of a pull.
We used to do a bit of telcom work manhole to manhole. Must be some sort of telcom standard, however our spacing was about 400 lf, 4" ducts.
Now with the advent of interstate fiber optic connections, I see quarter to half mile 2" PVC connections, PB to PB.

RK,

Following your lead, I used to work with a JW who could pull almost a 29" vacuum on a piece of 1/2" EMT, especially when talking to the boss . . . (but then, haven't we all worked with this guy?)

Work'in For That Free Tee . . .
__________________
Be Safe Out there
HighWirey is offline   Reply With Quote
Old 05-02-2008, 03:22 PM   #14
Senior Member
 
Join Date: Oct 2007
Location: central wisconsin
Posts: 215
Default

Quote:
Originally Posted by randomkiller View Post
Nope, closer to Green Bay
She moved over near Westfield after her divorce. Nice girl.
__________________
John
jrclen is offline   Reply With Quote
Old 05-02-2008, 09:50 PM   #15
"A" inside wireman
 
randomkiller's Avatar
 
Join Date: Sep 2007
Location: Ocean, NJ
Posts: 3,951
Send a message via Yahoo to randomkiller
Default

Quote:
Originally Posted by jrclen View Post
She moved over near Westfield after her divorce. Nice girl.

Not much of a looker but boy can she vacuum.
__________________
A Veteran - whether active duty, retired, guard or reserve - is someone who, at one point in his life, wrote a blank check made payable to "The United States of America," for an amount of "up to and including my life."

"One Nation Under God"
randomkiller is offline   Reply With Quote
Old 05-02-2008, 10:20 PM   #16
Seen your member
 
480sparky's Avatar
 
Join Date: Sep 2007
Location: Cornpatch USA
Posts: 9,988
Default

I've gone back through all my old Code books (back to '37) and cannot find even an old rule that has been taken out. This is one of those electricians mysteries (no splicing in panels, why '3-way' switches, etc) that defies explanation, let alone an origin.
__________________
This message is hidden because Forgery, Honda Racer, JackBoot, LawnGuyLandSparky, milehiwire and user 5941 are on your ignore list.
480sparky is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Mounting pull station on extrusion. MDShunk Other Codes and Standards 19 03-17-2010 11:20 PM
Big Wire Pull doedgo Tools, Equipment and New Products 1 11-07-2008 02:55 PM
Pull-Box Enigma Bitto General Electrical Discussion 9 07-04-2008 12:08 PM