Default RV Pedestals

I lost a job installing power to (7) RV sites by over a thousand bucks.
I estimated (7) 30amp pedestals.

I drove through the site this afternoon to see what the competition installed. They installed (3) double sided pedestals and (1) single sided pedestal.

The sites are pull throughs and are 30' wide. Reading in the code book on location it surely seems they have been installed illegally.

2002 NEC 551.77(A)

any thoughts guys?

faber307 is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 04-26-2007, 05:23 PM   #2
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 17,305
Rewards Points: 2,000
Default

Here's that section, from the 2002 NEC:

551.77 Recreational Vehicle Site Supply Equipment.
(A) Location.
Where provided on back-in sites, the recreational
vehicle site electrical supply equipment shall be located
on the left (road) side of the parked vehicle, on a line
that is 1.5 m to 2.1 m (5 ft to 7 ft) from the left edge
(driver’s side of the parked RV) of the stand and shall be
located at any point on this line from the rear of the stand to
4.5 m (15 ft) forward of the rear of the stand.
For pull-through sites, the electrical supply equipment
shall be permitted to be located at any point along the line
that is 1.5 m to 2.1 m (5 ft to 7 ft) from the left edge
(driver’s side of the parked RV) from 4.9 m (16 ft) forward
of the rear of the stand to the center point between the two
roads that gives access to and egress from the pull-through
sites.
The left edge (driver’s side of the parked RV) of the
stand shall be marked.

MDShunk is offline   Reply With Quote
Old 04-26-2007, 05:25 PM   #3
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 17,305
Rewards Points: 2,000
Default

From that, I'd say that if the RV can pull in from either road to the site, a double sided pedestal would be legal. Sorta like gas pumps; pull in from different directions, and the pedestal can be on the left for both RV's. Maybe I'm missing something important, but that's my personal take, at the moment.
MDShunk is offline   Reply With Quote
Old 04-26-2007, 05:43 PM   #4
Modérateur
 
frenchelectrican's Avatar
 
Join Date: Mar 2007
Location: NE Wi / Paris France{ In France for while }
Posts: 4,836
Rewards Points: 2,000
Default

it possible but what i belive most RV park they will " angled " the drive thru because it more eaiser to get in and get out due the size of the traveltrailer some are pretty huge and need some room to turn at few points.

but majorty of the RV and TT [ travel trailers ] the power cord is always on left side so it should go in one way but try to get in " wrong " way will look pretty funny in case someone try to get out or get in and the pedsteal is too close to the door [ i did see at least few done that way but not very festiable to do it ]

And most RV park do have somekind of guideline how they can set it up in proper way.

Merci , Marc
frenchelectrican is offline   Reply With Quote
Old 04-26-2007, 05:47 PM   #5
Senior Member
 
Join Date: Jan 2007
Location: Michigan
Posts: 265
Rewards Points: 250
Default

The site would have to be no longer than 32' from end to end to qualify as I read the description.

The pedestals were not installed in the middle of the sites.
If you can imagine 2 drives runing east and west, pull through sites between. All pedestals installed at the north drive entrances.

Basically it just pizzes me off that these guys are always cheaper.
Now The customer wonders why I'm so far off the mark.

faber307 is offline   Reply With Quote
Old 04-26-2007, 05:51 PM   #6
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 17,305
Rewards Points: 2,000
Default

Quote:
Originally Posted by Tab Faber View Post
The pedestals were not installed in the middle of the sites.
Well,... that's a horse of another color then, isn't it? I sure wouldn't hesitate to drop a dime on this. There are distance limits for those peds, and a very long site couldn't really utilize a double-sided ped, could it? I see your point. If the parking pad was 32 feet, the ped would need to be dead centered. Any longer than 32 feet, and you'd need two, single-sided peds.

Yes, guys that get away with skirting the code (and the specs, sometimes), really grind on me.
MDShunk is offline   Reply With Quote
Old 04-26-2007, 05:55 PM   #7
Senior Member
 
Join Date: Jan 2007
Location: Michigan
Posts: 265
Rewards Points: 250
Default

worst part,

last year drove walked through the park with the city manager. drew up some sketches and submitted budgetary numbers.

I knew they would throw this on the street, but did it anyway.

(City of Beaverton, I'm Beaverton Electric)

None the less, I get a formal letter this year to bid the job.
I bid it skinny and got spanked anyway.

I'm calling our inspector to get his take.
faber307 is offline   Reply With Quote
Old 04-26-2007, 05:56 PM   #8
Modérateur
 
frenchelectrican's Avatar
 
Join Date: Mar 2007
Location: NE Wi / Paris France{ In France for while }
Posts: 4,836
Rewards Points: 2,000
Default

32 feet ?? for parking pad only ?? humm IMO that really pushing the luck there i have pretty big traveltrailer that is 30 feet long and no way i can see why they put the pedsteal on the end of the parking pad and most power cord is useally 15-25 feet the most but few place i know they will extended the cord more longer with rv extionson cord there.

Merci , Marc
frenchelectrican is offline   Reply With Quote
Old 04-26-2007, 05:59 PM   #9
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 17,305
Rewards Points: 2,000
Default

Quote:
Originally Posted by Tab Faber View Post
I bid it skinny and got spanked anyway..
You said you got outbid by 1,000 bucks. Honestly, despite the fact that they used less equipment than you, that doesn't really seem like too bad of a spread to me. What was the rough total price of the project?
MDShunk is offline   Reply With Quote
Old 04-26-2007, 06:02 PM   #10
Senior Member
 
Join Date: Jan 2007
Location: Michigan
Posts: 265
Rewards Points: 250
Default

Mine was $6,174.00
faber307 is offline   Reply With Quote
Old 04-26-2007, 06:08 PM   #11
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 17,305
Rewards Points: 2,000
Default

Quote:
Originally Posted by Tab Faber View Post
Mine was $6,174.00
Oh, my. Yeah, getting beat by 1K on a job that small would be quite aggrivating. I see more clearly now. All the more reason to ask some well-planned questions of the inspector.
MDShunk is offline   Reply With Quote
Old 05-01-2007, 08:43 AM   #12
Senior Member
 
Join Date: Jan 2007
Location: Michigan
Posts: 265
Rewards Points: 250
Default

Well turns our city's waste water superintendant asked the contractor to hang on so he could mark the existing underground. The boys said don't bother.

I'm told they hit (3) underground lines to other pedestals.
didn't fixt the conduits. but spliced, taped, then skotch coated the splices.

The inspector agrees the pedestals were not installed to code and is now pondering his next move. They are back in sites not pull throughs. The north road turns out to be a bike path.

Probably to late seeing he signed off the job.

Oh, and they installed a 3 pole breaker instead of 2 pole for the new line of rv pedestals.
faber307 is offline   Reply With Quote
Old 05-05-2007, 06:51 AM   #13
Junior Member
 
Join Date: Jan 2007
Posts: 12
Rewards Points: 10
Default

I am glad you dropped the quarter on this guy. I too hate lowballers who steal the bid then do sub standard work. They drive the entire industry down, and make the rest of us look like crooks when we are just rying to make an honest living.

If the inspector wants he can still go back on this guy. An inspectors signature does not relieve a contractor of any liability for his work. Though it would make the inspector look bad among his piers.

jwhite is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
RV Pedestals faber307 General Electrical Discussion 21 03-11-2007 06:58 PM


All times are GMT -4. The time now is 06:25 AM.


Copyright © 2006-2014 Escalate Media LP. All Rights Reserved
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com