Electrician Talk - Professional Electrical Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Electrician Talk - Professional Electrical Contractors Forum > Electrical Trade Topics > Other Codes and Standards

Reply
 
Thread Tools Search this Thread Display Modes
Old 07-20-2012, 10:58 AM   #1
Junior Member
 
Join Date: Jul 2012
Location: Utah
Posts: 3
Default UL Rating

Will the UL rating be voided if the CB in a meter main is bypassed?

JakeW1 is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 07-20-2012, 11:01 AM   #2
BBQ
Senior Member
 
BBQ's Avatar
 
Join Date: Nov 2010
Location: New England
Posts: 23,768
Default

UL will say it is up to the AHJ to determine if the modifications effect the equipment to the point it would need a 'field evaluation'

Why would you want to do this?

BBQ is offline   Reply With Quote
Old 07-20-2012, 11:47 AM   #3
Electrical Simpleton
 
Pete m.'s Avatar
 
Join Date: Nov 2011
Location: Ohio
Posts: 927
Default

How exactly do you intend to "bypass" it?

Pete
__________________
Confidence is the feeling you have before you understand the situation.
Pete m. is offline   Reply With Quote
Old 07-20-2012, 04:29 PM   #4
Registered Big Member
 
mxslick's Avatar
 
Join Date: Feb 2009
Location: Hawthorne, California
Posts: 2,718
Default

And it's UL listing, not rating.
__________________
Freshly manscaped for your motocross riding pleasure.
mxslick is offline   Reply With Quote
Old 07-20-2012, 11:16 PM   #5
Junior Member
 
Join Date: Jul 2012
Location: Utah
Posts: 3
Default

Okay, UL listing. Your correct. Congratulations.

Pete,
I'm going to remove it and wire directly to the meter lugs. Exactly.

BBQ,
We have a line division where I work, and one of the linemen replaced a meter with a meter main on an existing home. The meter main, now the first point of disconnect, has created some code issues with the grounding. The easiest solution is to remove the breaker in the panel. Thanks for providing the only useful answer.
JakeW1 is offline   Reply With Quote
Old 07-20-2012, 11:17 PM   #6
not a union thug
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 6,973
Default

Quote:
Originally Posted by JakeW1 View Post
Okay, UL listing. Your correct. Congratulations.

Pete,
I'm going to remove it and wire directly to the meter lugs. Exactly.

BBQ,
We have a line division where I work, and one of the linemen replaced a meter with a meter main on an existing home. The meter main, now the first point of disconnect, has created some code issues with the grounding. The easiest solution is to remove the breaker in the panel. Thanks for providing the only useful answer.
How does removing the breaker correct grounding issues?
electricmanscott is offline   Reply With Quote
Old 07-20-2012, 11:38 PM   #7
Heavily Armed Member
 
HARRY304E's Avatar
 
Join Date: Sep 2010
Location: Fascistchusetts
Posts: 29,400
Default

Quote:
Originally Posted by electricmanscott View Post
How does removing the breaker correct grounding issues?
Because the lineman removed the old meter socket and installed a meter mane that makes the panel a sub panel so the neutrals and grounds must be separated Because the meter main is the first disconnect.

JakeW1;Welcome to the forum.....

Last edited by HARRY304E; 07-20-2012 at 11:41 PM.
HARRY304E is online now   Reply With Quote
Old 07-21-2012, 08:55 AM   #8
not a union thug
 
electricmanscott's Avatar
 
Join Date: Feb 2010
Location: Massachusetts
Posts: 6,973
Default

Quote:
Originally Posted by HARRY304E View Post
Because the lineman removed the old meter socket and installed a meter mane that makes the panel a sub panel so the neutrals and grounds must be separated Because the meter main is the first disconnect.

JakeW1;Welcome to the forum.....
So what is the op going to do, remove the breaker in the meter "MAIN" not "MANE"
electricmanscott is offline   Reply With Quote
Old 07-21-2012, 09:48 AM   #9
976-EVIL
 
mcclary's electrical's Avatar
 
Join Date: Feb 2009
Location: State of Euphoria
Posts: 13,408
Default

Quote:
Originally Posted by electricmanscott

So what is the op going to do, remove the breaker in the meter "MAIN" not "MANE"
Yep. Sounds like a good solution
mcclary's electrical is offline   Reply With Quote
Old 07-21-2012, 09:20 PM   #10
Junior Member
 
Join Date: Jul 2012
Location: Utah
Posts: 3
Default

Thanks, Harry.
JakeW1 is offline   Reply With Quote
The Following User Says Thank You to JakeW1 For This Useful Post:
HARRY304E (07-21-2012)
Old 07-21-2012, 09:23 PM   #11
Heavily Armed Member
 
HARRY304E's Avatar
 
Join Date: Sep 2010
Location: Fascistchusetts
Posts: 29,400
Default

Quote:
Originally Posted by JakeW1 View Post
Thanks, Harry.
Your welcome..
HARRY304E is online now   Reply With Quote
Old 07-21-2012, 09:28 PM   #12
Heavily Armed Member
 
HARRY304E's Avatar
 
Join Date: Sep 2010
Location: Fascistchusetts
Posts: 29,400
Default

Quote:
Originally Posted by electricmanscott View Post
So what is the op going to do, remove the breaker in the meter "MAIN" not "MANE"
Yes he is going to bypass the breaker and go into a main breaker in the panel that makes it the main disconnect so the meter main becomes just a meter socket .

You spelling sissy...
HARRY304E is online now   Reply With Quote
The Following User Says Thank You to HARRY304E For This Useful Post:
electricmanscott (07-21-2012)
Old 08-11-2012, 06:18 AM   #13
Senior Member
 
chicken steve's Avatar
 
Join Date: Mar 2011
Location: Vermont
Posts: 11,491
Default

I had one AHJ inform me that he was empowered to be a field evaluator for UL

now i'm unsure as to just where, or how this authority was granted him, but i did get the impression it was not something done automaticaly, or via quick phone call

~CS~
chicken steve is offline   Reply With Quote
Old 08-14-2012, 01:31 AM   #14
Junior Member
 
Join Date: Oct 2010
Location: Saskatchewan, Canada
Posts: 14
Default

bypass the breaker seems like a good plan, may want to remove it all together and blank off the opening in the enclosure for clarity. or at least label the breaker as not used. not sure how removing it would effect UL listing...

bakerbrynn is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
De-Rating Cletis NEC Code Forum 16 04-18-2012 10:01 PM
Standard wire rating vs continuous load rating guitarboyled NEC Code Forum 5 11-30-2010 06:17 AM
Box rating Teaspoon Residential Electrical Forum 6 04-09-2010 02:39 PM
fuse rating CSDC ELEC UK Electrical Forum 3 03-06-2010 02:27 PM
De-Rating simplified? Electrician343 General Electrical Discussion 13 05-02-2009 11:15 AM

Top of Page | View New Posts

All times are GMT -4. The time now is 11:35 PM.


Electrician Talk © 2006 - 2010 The Building Network

Search Engine Optimization by vBSEO 3.6.0 RC 2