25 kv rotation 1/4 mile
balance of your point to ground over long distance lines to ground plane , the arrangement of those conductors in space ,usually by need to avoid sparkover between adjacent conductors but phasing mutiple circuits in length or distance runs of three phase high voltage circuits are arranged abc top to bottom and to avoid that old increase in magnetic field in that space , mainly to ground plane to earth path , to avoid this high magnetic effect or non cancel effect problem maybe to cross existing lines above or below these . cba abc bca is used to give it a spiral effect or mixing balance over distance in length of a run , i think it may also effect or help in the high energy of a lighting near arc in the area of conductors which would be a increase if they where abc or stacked in long length. like twisting 400 cycle conductors for high freq work, but do not listen to me , this is just what i think is the only possible reason unless the power company just screwed up your area , think of this lets look at rotation our power co. has bca downtown orlando not abc ,but when you test with your roto meter it reads clockwise , only problem is when we have a tie breaker connection condition you must then know that its real important to know what the power co. has from the start , thanks for the question its got me thinking about what the people we get our power from are doing at the plant and why .
Last edited by nick; 06-28-2008 at 04:51 PM.
Reason: add some info
|