Old 06-04-2008, 07:46 PM   #1
Senior Member
 
Join Date: Feb 2007
Location: Eighty Four,Pa.15330
Posts: 1,660
Default Line Phase rotation

Reviewed a utility high voltage line upgrade proposal for a xfmr upgrade on our facility,today. 25kv lines. What I noticed was from substation to substation phase rotation was flipped about every 1/4 mile.abc,acb,cba. Was this planned or just random?
bobelectric is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 06-27-2008, 08:13 PM   #2
Registered Member
 
Join Date: Feb 2008
Location: orlando florida
Posts: 947
Default 25 kv rotation 1/4 mile

balance of your point to ground over long distance lines to ground plane , the arrangement of those conductors in space ,usually by need to avoid sparkover between adjacent conductors but phasing mutiple circuits in length or distance runs of three phase high voltage circuits are arranged abc top to bottom and to avoid that old increase in magnetic field in that space , mainly to ground plane to earth path , to avoid this high magnetic effect or non cancel effect problem maybe to cross existing lines above or below these . cba abc bca is used to give it a spiral effect or mixing balance over distance in length of a run , i think it may also effect or help in the high energy of a lighting near arc in the area of conductors which would be a increase if they where abc or stacked in long length. like twisting 400 cycle conductors for high freq work, but do not listen to me , this is just what i think is the only possible reason unless the power company just screwed up your area , think of this lets look at rotation our power co. has bca downtown orlando not abc ,but when you test with your roto meter it reads clockwise , only problem is when we have a tie breaker connection condition you must then know that its real important to know what the power co. has from the start , thanks for the question its got me thinking about what the people we get our power from are doing at the plant and why .

Last edited by nick; 06-28-2008 at 04:51 PM. Reason: add some info
nick is offline   Reply With Quote
Old 06-28-2008, 11:25 PM   #3
Junior Member
 
Join Date: Dec 2007
Location: tennessee
Posts: 2
Default

ABC-BCA-CAB will always give you a clockwise rotation, because in phasing a leads b leads and c leads a. There could be several different reasons the phases were flopped, most likely cause is they rolled into a vertical pole abc and probably rolled out cba or something of that matter.
powerlineman78 is offline   Reply With Quote
Old 06-29-2008, 06:42 AM   #4
Senior Member
 
Join Date: Feb 2007
Location: Eighty Four,Pa.15330
Posts: 1,660
Default

Thanks to both of you for your answers.
bobelectric is offline   Reply With Quote
Old 06-29-2008, 07:16 AM   #5
Registered Member
 
Join Date: Feb 2008
Location: orlando florida
Posts: 947
Default 25 kv rotation

thank you also for that question , and thank you for the solution most of our work is commercial but on some work we do industrial work or we are the subs for the high voltage work so we get a little bit into that . most of the stuff is going underground now in florida we get a little wind and rain down here .and the phases must be stacked in trenches like a above c ,b above a and c above b underground to cancel out magnetic effects . yes i agree incoming to out going is a problem so your correct you solved that one . always interested in what other parts of the usa are doing and you learn that everyday . didnt know if it was overhead or underground i read to fast sometimes and go back and well you know .
nick is offline   Reply With Quote
Old 07-01-2008, 07:31 PM   #6
Senior Member
 
Join Date: Feb 2007
Location: Eighty Four,Pa.15330
Posts: 1,660
Default

Nick,this is overhead,25kv pole mounted 556 AA bare conductor,mostly horizontal,sometimes rolling to vertical,to underground 35kv,750mcm Lotsa watts
bobelectric is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Line to line voltage coen Lighting Design 3 06-04-2008 09:24 AM
3 phase 220 to single phase 220 cwilken General Electrical Discussion 2 08-29-2007 07:14 PM
three phase to single phase convertion. brick General Electrical Discussion 2 07-29-2007 07:55 PM
two phase or single phase jorge General Electrical Discussion 9 03-27-2007 01:06 PM
Phase rotation meters MDShunk Tools, Equipment and New Products 2 03-11-2007 08:51 PM

Top of Page | View New Posts

All times are GMT -4. The time now is 01:23 PM.


Electrician Talk © 2006 - 2009 The Building Network LLC

Search Engine Optimization by vBSEO 3.2.0