Electrician Talk - Professional Electrical Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Electrician Talk - Professional Electrical Contractors Forum > Electrical Trade Topics > Linework

Reply
 
Thread Tools Search this Thread Display Modes
Old 01-28-2007, 01:09 PM   #1
Moderator
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 6,670
Default Parking lot light installation

The following picture shows men installing parking lot lighting from a JLG boom lift. Special thanks to Derek Pasch, Staffing Specialist at Meisner Electric in Delray Beach, FL for the pictures. The fella on the left must have been on break. He appears to be asleep.

MDShunk is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 02-01-2007, 10:41 PM   #2
Senior Member
 
Joe Momma's Avatar
 
Join Date: Jan 2007
Location: Salt Lake City
Posts: 617
Default

Or perhaps just scared of heights and trying not to puke.

Were they raising the poles with the snorkel lift or just attaching heads?
We did them from a JLG once, but they wre on wood poles, normally we mount the heads on the ground and have a crane out for a couple hours to raise all the poles.
__________________
Joe Momma was here
Joe Momma is offline   Reply With Quote
Old 02-02-2007, 07:26 PM   #3
Moderator
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 6,670
Default

Quote:
Originally Posted by Joe Momma View Post
Were they raising the poles with the snorkel lift or just attaching heads?.
Hard to tell.

I always bolt the heads on while on the ground, and go ahead and run the conductors down to the handhole and get everything wired up at the heads. That way, all you gotta do is stand them up and get them level. Myself, I generally get them all stood up and "eyeball level", then go back and fine tune level them all at once. Sometimes you need to tape a nickel to the end of your level to compensate for tapered posts. I know people have lots of different tricks for leveling tapered posts. Some guys hang a plumb bob at arm's length, and stand back and sight the post off that hanging plumb bob.
MDShunk is offline   Reply With Quote
Old 02-02-2007, 08:30 PM   #4
Senior Member
 
Joe Momma's Avatar
 
Join Date: Jan 2007
Location: Salt Lake City
Posts: 617
Default

We always hang them as fast as possible too, with crane costs and all. Last summer me and a JW I'm used to did 26 in less than 2 hours, we were pretty proud of ourselves. Then he leveled for the rest of the day while I wired (and fought wasps in one pole, I batted down at least 4 with a shovel I found).

I like that trick of taping a shim/nickel to the level. Once you get it set then all the poles will be the same.
__________________
Joe Momma was here
Joe Momma is offline   Reply With Quote
Old 03-08-2007, 04:50 PM   #5
Junior Member
 
Pinhead's Avatar
 
Join Date: Mar 2007
Posts: 21
Default

Quote:
Originally Posted by MDShunk View Post
Sometimes you need to tape a nickel to the end of your level to compensate for tapered posts. I know people have lots of different tricks for leveling tapered posts. Some guys hang a plumb bob at arm's length, and stand back and sight the post off that hanging plumb bob.
Wow, those are really good tips.
Pinhead is offline   Reply With Quote
Old 12-14-2007, 08:29 PM   #6
Junior Member
 
Join Date: Dec 2007
Location: Bangor, ME
Posts: 2
Default

What we generally do (this is our 3rd Lowe's this year, and have done a few other styles of lights in the past) is level the lugs first on the concrete pads. Then just stand up the built pole with either the boom truck or rent a crane and set them on, and then all you have to do is burndy the leads together. Most of the lights we do are either 277 or 480, 2awg to the base, 4awg from the base to the heads. Longest pull for the parking lot lights was 760' of 4awg, that one took a while with the old tugger just a tuggin.
__________________
"Wire pullin', nut twist'n pipe bending light hanging crazy Mainah."
perley03 is offline   Reply With Quote
Old 12-14-2007, 08:50 PM   #7
Junior Member
 
Pinhead's Avatar
 
Join Date: Mar 2007
Posts: 21
Thumbs up

Why such large wire? Voltage drop? Thanks for your reply, it was very informative. Oh, never mind, I just re-read your post and see the extreme lengths of the runs. :-)
Pinhead is offline   Reply With Quote
Old 12-14-2007, 09:13 PM   #8
Junior Member
 
Join Date: Dec 2007
Location: Bangor, ME
Posts: 2
Default

Use such wire because the engineers who designed the plans for Lowe's wanted to use them on the long pulls. On the shorter runs, I believe it's either 6 or 4awg to the base, 10awg to the heads. There is alot of overkill in these stores, I guess they didn't want to mess around.
__________________
"Wire pullin', nut twist'n pipe bending light hanging crazy Mainah."
perley03 is offline   Reply With Quote
Old 12-14-2007, 10:54 PM   #9
Senior Member
 
Pierre Belarge's Avatar
 
Join Date: Feb 2007
Location: Westchester County, NY
Posts: 194
Default

Larger conductors have less heat loss...hence a savings of some $ during the use of the lights, which probably burn for quite a few hours each day. Long term savings for Lowes.
Pierre Belarge is offline   Reply With Quote
Old 12-14-2007, 11:51 PM   #10
Moderator
 
Join Date: Jan 2007
Location: NY State
Posts: 3,336
Default

I did the parking lot lights for a Sam's/Lowes. MAN those were some long hard pulls.

perley's description is exactly how I do it.
Speedy Petey is offline   Reply With Quote
Old 12-14-2007, 11:57 PM   #11
Seen your member
 
480sparky's Avatar
 
Join Date: Sep 2007
Location: Cornpatch USA
Posts: 9,881
Default

Quote:
Originally Posted by Pinhead View Post
Why such large wire? Voltage drop? Thanks for your reply, it was very informative. Oh, never mind, I just re-read your post and see the extreme lengths of the runs. :-)
I've done some WalMart light runs that were fed with #0, #6 up the pole.
__________________
I_get_shocked : Online now and knows where to look up the answer.

To anything!
480sparky is online now   Reply With Quote
Old 12-27-2007, 08:48 AM   #12
Junior Member
 
Join Date: Oct 2007
Location: Mundys Corner Pa
Posts: 19
Default long pulls

have worked on several TV towers 2000Ft 4/0 pulls for strobe lites.
reddog552 is offline   Reply With Quote
Old 12-27-2007, 02:19 PM   #13
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

Quote:
Originally Posted by reddog552 View Post
have worked on several TV towers 2000Ft 4/0 pulls for strobe lites.
was that mostly up?
nap is offline   Reply With Quote
Old 12-27-2007, 02:37 PM   #14
Mad Skills
 
Celtic's Avatar
 
Join Date: Nov 2007
Location: NJ
Posts: 1,191
Default

Quote:
Originally Posted by MDShunk View Post

I always bolt the heads on while on the ground, and go ahead and run the conductors down to the handhole and get everything wired up at the heads.
Before we stand them up, we heat 'em up

If the bulb, ballast, etc turns out to NFG - it's a quick swap on terra firma
__________________

Fountain of Useless Information
Celtic is offline   Reply With Quote
Old 12-27-2007, 02:40 PM   #15
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

Not a bad idea there celtic.
nap is offline   Reply With Quote
Old 12-27-2007, 02:52 PM   #16
Senior Member
 
Join Date: Sep 2007
Location: Cocoa, FL USA
Posts: 625
Default

On that tower work:

Any work you can perform on the ground is a plus. How much can a few strobes consume, even considering the VD, the 4/0, must have been aluminum, and must have been spec. Enlighten me here gents . . .

"was that mostly up?".
Cannot imagine feeding from the top down . . .

Best Wishes
__________________
Be Safe Out there
HighWirey is offline   Reply With Quote
Old 12-27-2007, 02:52 PM   #17
Mad Skills
 
Celtic's Avatar
 
Join Date: Nov 2007
Location: NJ
Posts: 1,191
Default

Quote:
Originally Posted by nap View Post
Not a bad idea there celtic.


While going up in the lift is "oh so glamorous"....being the "re-do crew" in freezing weather is for the birds
__________________

Fountain of Useless Information
Celtic is offline   Reply With Quote
Old 12-27-2007, 03:06 PM   #18
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

Quote:
Originally Posted by HighWirey View Post
On that tower work:

Any work you can perform on the ground is a plus. How much can a few strobes consume, even considering the VD, the 4/0, must have been aluminum, and must have been spec. Enlighten me here gents . . .

"was that mostly up?".
Cannot imagine feeding from the top down . . .

Best Wishes
I was referring more to was most of that 2000' running the tower as opposed to getting to the tower.

Top down? How could you ever so that?
nap is offline   Reply With Quote
Old 12-27-2007, 03:17 PM   #19
Senior Member
 
Join Date: Sep 2007
Location: Cocoa, FL USA
Posts: 625
Default

Marc,

Meisner Electric came into central Florida like gangbusters, was awarded a large project from under us locals, learned their lession, then went back to Delray Beach. Seems it took ten years to settle their claims in court. My NASA contracting officer had a room full of court docs concerning that contact.

Correct me if it is not gospel.

Been incorrect before, and done that.

Best Wishes
__________________
Be Safe Out there
HighWirey is offline   Reply With Quote
Old 12-28-2007, 09:22 AM   #20
Junior Member
 
Join Date: Oct 2007
Location: Mundys Corner Pa
Posts: 19
Default tower lighting

yes its up. we pre assemble 250' runs,then raise them to tower. this is quite tricky. The 3" rigid will crack at couplings.the reason for 250' ft runs is a strain releaf box+ light is required.We use a special rigging,lifting at 3 points.
reddog552 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need suggestions for installing parking lot receptacles personal General Electrical Discussion 13 10-13-2008 03:59 AM
domestic installation boots General Electrical Discussion 0 09-16-2007 04:24 PM
Billiard light installation? pip9ball General Electrical Discussion 1 08-30-2007 04:38 AM
Parking vs CT cabinet JohnJ0906 Services and Service Equipment 5 05-05-2007 07:13 AM
Parking lot light JohnJ0906 Code Violation Discussion 2 01-30-2007 08:18 PM

Top of Page | View New Posts

All times are GMT -4. The time now is 02:49 PM.


Electrician Talk © 2006 - 2009 The Building Network LLC

Search Engine Optimization by vBSEO 3.2.0