 |
|
06-23-2009, 06:40 PM
|
#1
|
|
Senior Member
Join Date: Sep 2007
Location: Phoenix, AZ
Posts: 1,160
|
Another AZ resi service change.
It's getting hot here. I drank a gallon of water and still started cramping at about 12:30
Old service....Zinsco 200 amp circa 1980 something. It had a 20A and a couple of 30 amp AC circuits added in the 90's along with a load controller and pool equipment. Kitchen remodel required two more 20's and we threw in a circuit for the smoke detectors we had to add throughout.
POCO disconnected/safed off conductors ar 8AM.
Panel was A) Zinsco and B) jammed with twins. Nice design putting the neutral/ground bus at the bottom. Wires were a MESS down there.
.Pulled the old one off and beat out some block to get some more cable to work with. I HATE wirenuts in a panel.
Panel was mounted by about 10 AM.
Drilled a couple of holes in the back to maximize existing wire length, installed the infamous plastic snap in bushings, bent the rigid pool conduit over a bit and used existing 2" IMC riser. Secured with 3/8" sleeve anchors.
Installed 1 1/2" EMT to a JB under the eave to contain the added circuits. The two I added passed thru NM all the way to the panel. The existing ones were too short so I used THWN. I did not strap/secure the 1 1/2" EMT. (insert clown emote) I DID however install an AFCI on the smokie circuit (cancels out clown emote)
Panel and associated crap were made up by 1:30 PM
Used up all 40 spaces.
99% of the time, I remove the load controller. This clown wanted it hooked up
I'm not even sure that this type of load controller installation is legal. They take one leg from a 240V load (typically AC's, WH's or dryers) and run it thru a single pole contactor which shuts it down if demand is too high during peak hours.
POCO give a better KWH rate if you keep load down below X KWH during peak hours. The controller is suppose to help with that but I think it's a scam. This one only controlled the dryer and WH.
|
|
|
Join the #1 Electrician Forum Today - It's Totally Free!
ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!
Join ElectricianTalk.com - Click Here

|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
06-23-2009, 07:18 PM
|
#2
|
|
child please.....
Join Date: Oct 2008
Location: Hack City, USA aka New Orleans
Posts: 2,955
|
looks good...you must get bored doing these(except when you collect the check)...seems like everyone is the same...good job
|
|
|
06-23-2009, 07:39 PM
|
#3
|
|
Senior Member
Join Date: Sep 2007
Location: Phoenix, AZ
Posts: 1,160
|
Yeah, they all pretty much look alike huh?
Work is slow so I'll take what I can get. I'd much rather do these than cutting in recessed cans. Ugh!
|
|
|
06-23-2009, 07:42 PM
|
#4
|
|
B4T Scotchkote installer
Join Date: Feb 2009
Location: Long Island, N.Y.
Posts: 4,455
|
Really nice job.. I just can't get used to seeing circuit breakers outside like that.
Must be a PITA when on south side of a house
|
|
|
06-23-2009, 07:42 PM
|
#5
|
|
Moderator
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 6,870
|
This thread is worthless without close-ups of the blue knockout bushings.
Nice work.
__________________
|
|
|
06-23-2009, 08:11 PM
|
#6
|
|
child please.....
Join Date: Oct 2008
Location: Hack City, USA aka New Orleans
Posts: 2,955
|
Quote:
Originally Posted by 220/221
Yeah, they all pretty much look alike huh?
Work is slow so I'll take what I can get. I'd much rather do these than cutting in recessed cans. Ugh!
|
yeah, cut them in by hand too...i like the oldschool approach
|
|
|
06-23-2009, 08:12 PM
|
#7
|
|
child please.....
Join Date: Oct 2008
Location: Hack City, USA aka New Orleans
Posts: 2,955
|
Quote:
Originally Posted by MDShunk
This thread is worthless without close-ups of the blue knockout bushings.
Nice work.
|
yeah, thats the 220/221 trademark...seriously though i know i asked you this before...but, what would you use to secure the wires to the panel in this situation?...
|
|
|
06-23-2009, 08:16 PM
|
#8
|
|
Moderator
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 6,870
|
Quote:
Originally Posted by NolaTigaBait
yeah, thats the 220/221 trademark...seriously though i know i asked you this before...but, what would you use to secure the wires to the panel in this situation?...
|
You asking me? I do them exactly like he does. Well, sorta.... here in the Northeast we get more rain and snow, but we have very few outdoor panels. Of the one's I've changed out, I use a 1-1/2" or 2" PVC adapter to get a tiny little bit of sleeve (the hub of the adapter) between the panel and back into the wall a little bit. Squirt of spray foam back in there when things are wired up.
__________________
Last edited by MDShunk; 06-23-2009 at 08:28 PM.
Reason: type-o
|
|
|
06-23-2009, 08:20 PM
|
#9
|
|
child please.....
Join Date: Oct 2008
Location: Hack City, USA aka New Orleans
Posts: 2,955
|
Quote:
Originally Posted by MDShunk
You asking me? I do they exactly like he does. Well, sorta.... here in the Northeast we get more rain and snow, but we have very few outdoor panels. Of the one's I've changed out, I use a 1-1/2" or 2" PVC adapter to get a tiny little bit of sleeve (the hub of the adapter) between the panel and back into the wall a little bit. Squirt of spray foam back in there when things are wired up.
|
oh ok, thats what we do here as well...i feel a little better about have the male pvc b/c it offers a little more protection from the weather...
|
|
|
06-23-2009, 08:34 PM
|
#10
|
|
Senior Member
Join Date: Nov 2008
Location: Presque Isle, Maine
Posts: 2,245
|
The shut off one leg of the dryer tick is so that the motor keeps tumbling the clothing while the heating coil is off. This keeps the clothing from wrinkling and getting musty.
__________________
"Whatever is felt is within suffering."
|
|
|
06-23-2009, 08:44 PM
|
#11
|
|
B4T Scotchkote installer
Join Date: Feb 2009
Location: Long Island, N.Y.
Posts: 4,455
|
Just noticed Line side is the bottom??
The POCO does not want a By-pass meter pan?
|
|
|
06-23-2009, 09:10 PM
|
#12
|
|
Unlimited Lic.Electrician
Join Date: Sep 2008
Location: Charlotte N.C.
Posts: 7,768
|
Looks good to me.
|
|
|
06-23-2009, 09:41 PM
|
#13
|
|
Not Peter D
Join Date: Jan 2009
Location: USA
Posts: 5,406
|
Quote:
Originally Posted by 220/221
I HATE wirenuts in a panel.
|
Why? You ended up with wirenuts in the panel anyway so who really cares?
|
|
|
06-24-2009, 12:10 AM
|
#14
|
|
Senior Member
Join Date: Sep 2007
Location: Phoenix, AZ
Posts: 1,160
|
Quote:
|
Must be a PITA when on south side of a house
|
BRUTAL! This one was on the West side so I had shade under the eave until about 1:30. We carry big 6' diameter umbrellas on the trucks to help us out sometimes.
Quote:
|
This thread is worthless without close-ups of the blue knockout bushings
|
How bout black ones?
.
Quote:
|
what would you use to secure the wires to the panel in this situation?...
|
The terminals on the ground/neutral bus and breakers???
I don't know if it's written into local code or if, in 60 years, nobody ever said anything. In a pinch, caulk of some type would "secure" them to the enclosure.
Quote:
|
Just noticed Line side is the bottom??
|
Lugs are at the bottom, Bus runs to the top jaws. This panel is ALMOST a brilliant design. The lugs/bus flip over to convert from underground to overhead application. The huge fault in the design is the black self tapped screw used to attach the bus. When I flip them over I drill them out a bit and install 1/4 20 nuts/bolts/washers.
This old pic shows one leg flipped and one stock.
Quote:
|
The POCO does not want a By-pass meter pan?
|
Not on resi panels, only commercial.
Quote:
|
Why? You ended up with wirenuts in the panel anyway so who really cares?
|
Everybody has their "things". I like to end up with a "stock" installation. The only nuts I ended up with were from that freaking load controller and......one other....which is illegal. Care to make an educated guess?
|
|
|
06-24-2009, 12:33 AM
|
#15
|
|
Senior Member
Join Date: Nov 2007
Location: Chicago
Posts: 461
|
Can't see too well from the photo, but I'll guess your GEC.
|
|
|
06-24-2009, 12:37 AM
|
#16
|
|
Senior Member
Join Date: Sep 2007
Location: Phoenix, AZ
Posts: 1,160
|
WTF? Who would wirenut a GEC?
But no.
Existing ufer is solid #4 and was long enough. H2O bond was new and long enough also. No gas here.
Hint: It is clearly visable in the pics
|
|
|
06-24-2009, 01:32 AM
|
#17
|
|
Master RAT!!!
Join Date: Jan 2009
Location: Aurora, Colorado
Posts: 454
|
Cool.....after you knock the block out on jobs like these...what do you do to fill in the holes? Foam?
I know you dont get a lot of rain, but critters, and such?
__________________
- Dave ........
"Beware of the Rat....he has no Master...he works how & where he wants....  "
|
|
|
06-24-2009, 04:21 AM
|
#18
|
|
Registered Member
Join Date: Nov 2007
Posts: 2,575
|
Quote:
Originally Posted by Black4Truck
Just noticed Line side is the bottom??
The POCO does not want a By-pass meter pan?
|
It's not even 5-jaw! They're so behind the times.
|
|
|
06-24-2009, 04:25 AM
|
#19
|
|
Registered Member
Join Date: Nov 2007
Posts: 2,575
|
Don't tell me you reconnected the sprinkler controller the same way they had it?!
|
|
|
06-24-2009, 11:46 AM
|
#20
|
|
Senior Member
Join Date: Sep 2007
Location: Phoenix, AZ
Posts: 1,160
|
Quote:
|
after you knock the block out on jobs like these...what do you do to fill in the holes? Foam?
|
All I can do is caulk around the panel. The cables need to be loose to manipulate them into place. It's not an easy task when you are trying to work 4 holes and the service conductors are hot. Can bugs get in? Yeah. They can also walk in thru the doors, the screened eave vents and a number of other openings.
And...it's to hot and dry here for bugs
Quote:
|
Don't tell me you reconnected the sprinkler controller the same way they had it?!
|
I added a ground but left the UF sprinkler wires  ....but yeah. I also refed the jacuzzi or bath circuit to the right of the panel with sealtite
Hey, it's equipment. It looks fine.
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|