Electrician Talk - Professional Electrical Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Electrician Talk - Professional Electrical Contractors Forum > Electrical Trade Topics > Services and Service Equipment

Reply
 
Thread Tools Search this Thread Display Modes
Old 06-12-2007, 11:39 AM   #1
Senior Member
 
frank's Avatar
 
Join Date: Feb 2007
Location: Saxon Village near Doncaster. Buildings date to 8th century.Once a Roman Road
Posts: 1,061
Default Anyone useing these

I have been installing lots of these low energy conversions this week. A T8 1/2" tube at 28 watts replaces a 5' 58Watt tube. The T8 is 3 inches shorter. A pin converter is fixed to one end and a high frequency choke fitted to the other. The starter is changed also
It does save on energy consumption but the changeover cost is quite high.












Frank

Last edited by frank; 06-12-2007 at 02:12 PM.
frank is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 06-12-2007, 04:59 PM   #2
Senior Member
 
JohnJ0906's Avatar
 
Join Date: Jan 2007
Location: Baltimore, MD, USA
Posts: 3,486
Default

What IS the changeover cost?
__________________
John from Baltimore
"One day at a Time"
All responses based on the '08 NEC
It's not my fault, it's not my problem, I'm not your solution.
JohnJ0906 is offline   Reply With Quote
Old 06-12-2007, 05:15 PM   #3
Senior Member
 
frank's Avatar
 
Join Date: Feb 2007
Location: Saxon Village near Doncaster. Buildings date to 8th century.Once a Roman Road
Posts: 1,061
Default

John


The tube is £2 - 50
The kit is £17 - 50

So in total that is £20 - 00 and therefore about $42.

It ticks all the correct boxes when the inspector comes to call but I can't see the real savings myself. But when dealing with local government its tick box counting that matters if you want to get the next City Contract and you are seen as Green Friendly.These are new to the market at the moment so they will fall in price 75% the suppliers tell me.

The ready manufactured ones are cheaper but still not as cheap as a standard fitting.

Frank

Last edited by frank; 06-12-2007 at 05:17 PM.
frank is offline   Reply With Quote
Old 06-12-2007, 08:13 PM   #4
Senior Member
 
JohnJ0906's Avatar
 
Join Date: Jan 2007
Location: Baltimore, MD, USA
Posts: 3,486
Default

Quote:
Originally Posted by frank View Post
It ticks all the correct boxes when the inspector comes to call but I can't see the real savings myself. But when dealing with local government its tick box counting that matters if you want to get the next City Contract and you are seen as Green Friendly.
A whole ocean between us, and some things so similar.
__________________
John from Baltimore
"One day at a Time"
All responses based on the '08 NEC
It's not my fault, it's not my problem, I'm not your solution.
JohnJ0906 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Top of Page | View New Posts

All times are GMT -4. The time now is 11:28 AM.


Electrician Talk © 2006 - 2009 The Building Network LLC

Search Engine Optimization by vBSEO 3.2.0