 |
07-10-2012, 05:59 PM
|
#1
|
|
Member
Join Date: Apr 2011
Location: Atlantis
Posts: 35
|
Code Violations.
We replaced a burnt Zinsco today with some service equipment that seemed to have been added recently. I think the poco switched this neighborhood to underground service sometime in the past 10 years or so. But yeah, there's code violations on practically every installation I was able to see in the cul-de-sac. I didn't take pictures though, except for the one I changed out and the direct neighbors... didn't want to freak people out.
Also, I used the old panel enclosure as a make-up box and used the old neu/grd bar as a common point for the grds. Ran a #6 grd to the new panel. The electricians back in the days spun all the grounds together into some jacked up coil, which I didn't feel inclined to jack with. Is it a violation to tap all those grounds under one terminal?(bottom image)
230.71 Violation
Solution
Inside Mess
Used as a make-up box..
Lack of Communication
Last edited by SpaghettiMonster; 07-10-2012 at 06:01 PM.
|
|
|
Join the #1 Electrician Forum Today - It's Totally Free!
ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!
Join ElectricianTalk.com - Click Here

|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
07-10-2012, 06:15 PM
|
#2
|
|
Member
Join Date: Apr 2011
Location: Atlantis
Posts: 35
|
And here's what the neighbor had going on, I'm somewhere in Oklahoma... and we have local codes that require the DC means within a certain distance.
|
|
|
07-10-2012, 09:05 PM
|
#3
|
|
Senior Member
Join Date: Jul 2012
Location: NY
Posts: 134
|
yellow & orange wires in a single phase 240 panel ??
|
|
|
07-10-2012, 09:24 PM
|
#4
|
|
PGW Professional
Join Date: Jan 2007
Location: Rahway, NJ
Posts: 12,797
|
Quote:
Originally Posted by Spark Master
yellow & orange wires in a single phase 240 panel ??
|
What's wrong with that?
|
|
|
07-10-2012, 09:25 PM
|
#5
|
|
Senior Member
Join Date: Dec 2011
Location: Virginia
Posts: 898
|
Maybe I am missing something, but I don't see a 230.71 violation.
I do not see a Myers hub where you went into that new panel.
|
|
|
07-10-2012, 09:30 PM
|
#6
|
|
Senior Member
Join Date: Jul 2012
Location: NY
Posts: 134
|
Quote:
Originally Posted by Magnettica
What's wrong with that?
|
usually for 277/480 volts
|
|
|
07-10-2012, 10:33 PM
|
#7
|
|
Member
Join Date: Apr 2011
Location: Atlantis
Posts: 35
|
Quote:
Originally Posted by Bbsound
Maybe I am missing something, but I don't see a 230.71 violation.
I do not see a Myers hub where you went into that new panel.
|
I thought hubs were only used for horizontal surfaces? As for the violation, I was kinda unsure whether or not it is, that's why I posted here. You can only have 6 throws of the hand for DC means, and that panel could support additional circuits/feeders... 6 2-p or 12 sp, which would be a violation. But there's handle ties... so I dunno.
Yeah, I would normally use all those different colors, I just wanted to have all of them differentiated. That box is done for, the nipple going into it is packed tight. Any further additions will have to go in thru the attic.
Last edited by SpaghettiMonster; 07-10-2012 at 10:39 PM.
|
|
|
07-10-2012, 11:06 PM
|
#8
|
|
Registered Big Member
Join Date: Feb 2009
Location: Hawthorne, California
Posts: 2,720
|
Quote:
Originally Posted by Spark Master
yellow & orange wires in a single phase 240 panel ??
|
Yep, and the problem is........
Quote:
Originally Posted by Magnettica
What's wrong with that?
|
Absolutely nothing as far as Code is concerned.
Quote:
Originally Posted by Spark Master
usually for 277/480 volts
|
Yes, but not a violation enforceable under the Code. We had a similar discussion here: So many things wrong here.....
See post #6 and beyond.
__________________
Freshly manscaped for your motocross riding pleasure. 
|
|
|
07-11-2012, 09:05 PM
|
#9
|
|
PGW Professional
Join Date: Jan 2007
Location: Rahway, NJ
Posts: 12,797
|
Quote:
Originally Posted by Spark Master
usually for 277/480 volts
|
But certainly not a violation.
|
|
|
07-11-2012, 09:10 PM
|
#10
|
|
Good at being Evil
Join Date: Mar 2010
Location: Long Island,NY & Poconos
Posts: 11,119
|
Looks good, nice GE panel.
__________________
All these liberal laws has turned me into a right wingnut..
|
|
|
07-11-2012, 09:28 PM
|
#11
|
|
Senior Member
Join Date: Feb 2008
Location: Texas
Posts: 168
|
POCO requires main DC within 2ft of meter here.
|
|
|
07-11-2012, 10:16 PM
|
#12
|
|
Senior Member
Join Date: Dec 2011
Location: Virginia
Posts: 898
|
Quote:
Originally Posted by SpaghettiMonster
I thought hubs were only used for horizontal surfaces? As for the violation, I was kinda unsure whether or not it is, that's why I posted here. You can only have 6 throws of the hand for DC means, and that panel could support additional circuits/feeders... 6 2-p or 12 sp, which would be a violation. But there's handle ties... so I dunno.
Yeah, I would normally use all those different colors, I just wanted to have all of them differentiated. That box is done for, the nipple going into it is packed tight. Any further additions will have to go in thru the attic.
|
You are correct about the 6 throws, but that panel only has one breaker in it. So there is no code violation until the 7th breaker is added.
I can not quote the code section off the top of my head, but it is my understanding in 3R applications a hub is required unless the conduit entry is under the buss bars, etc.
|
|
|
07-11-2012, 10:21 PM
|
#13
|
|
Member
Join Date: Apr 2011
Location: Atlantis
Posts: 35
|
Quote:
Originally Posted by Bbsound
You are correct about the 6 throws, but that panel only has one breaker in it. So there is no code violation until the 7th breaker is added.
I can not quote the code section off the top of my head, but it is my understanding in 3R applications a hub is required unless the conduit entry is under the buss bars, etc.
|
Hmm! Well, I'll have to look into that further then... I've only ever used them on the horizontal surfaces, and the inspectors haven't dinged me yet. I'll try and find the article tonight, thanks!
|
|
|
09-18-2012, 10:06 PM
|
#14
|
|
Senior Member
Join Date: May 2011
Location: nh
Posts: 230
|
is there a disco for that condenser??
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|