Default Ground or not to ground?

Say we have a 480V/3-Phase/3-Wire corner grounded Delta Meterbase.
Looking at NEC2005 250.20(B) I am reading it as stating that this system does not need to be grounded.

Then, looking at NEC2005 250.21 it is stating that this system will need ground detectors installed (which I've never heard of before).

Would it not be possible to ground the system and not require ground detectors? Just needing a little help interpreting the code.
chenley is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectrcianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 05-06-2008, 09:25 PM   #2
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

You have things mixed up.

You have a corner GROUNDED system. That means one corner is grounded. Ground fault detectors are used with UNgrounded delta systems.
nap is offline   Reply With Quote
Old 05-06-2008, 10:08 PM   #3
Bilge Rat
 
Join Date: Aug 2007
Location: Fernley, Nevada (near Reno)
Posts: 652
Default

Here's what I get out of those code sections. A 480 volt 3PH 3 wire system is not required to be grounded. If it is not grounded, then a ground detector is required. (They exist, I've installed them). If it is grounded, (grounded B), then the ground detector is not required.

Just my opinion, but it seems to fit.

Rob
micromind is offline   Reply With Quote
Old 05-06-2008, 10:22 PM   #4
Senior Member
 
chenley's Avatar
 
Join Date: Feb 2007
Location: Kentucky
Posts: 628
Default

I was thinking of just the 3 Conductors coming in from the POCO side, which that would be where they ground the B phase on the transformer bank. I would ground the meterbase the same as any other three-phase service. Am I thinking through this right?
chenley is offline   Reply With Quote
Old 05-06-2008, 11:01 PM   #5
nap
a real PITA
 
Join Date: Dec 2007
Location: N. Central Indiana/ SW Michigan
Posts: 885
Default

Quote:
I was thinking of just the 3 Conductors coming in from the POCO side, which that would be where they ground the B phase on the transformer bank. I would ground the meterbase the same as any other three-phase service. Am I thinking through this right?
Now I'm not sure what you are asking. In may area, the meter base is grounded somtimes and sometimes it isn;t. It is a call by the POCO. Ultimately it needs to be bonded to the neutral or g e system or the EGC but how it is done varies with the POCO.

the POCO will ground one corner of the delta. You also need to bond that same corner to the GEC and associated system.

the only time you use ground fault detectors is when it is an ungrounded delta, which I have not seen installed in a long time and will not be installed in any area I work in unless there is some overwhelming need for it (in other words, they aren;t installing them anymore around here)

Basically, all of this depends on what type of service is being supplied. You need to be sure it is a corner grounded and install as needed for that. I doubt you would be looking at an ungrounded delta anymore.
nap is offline   Reply With Quote
Old 05-06-2008, 11:38 PM   #6
Senior Member
 
chenley's Avatar
 
Join Date: Feb 2007
Location: Kentucky
Posts: 628
Default

It's definitely going to be a corner grounded delta. Going to call the Line Inspector tomorrow morning and verify with him about this install. Called my boss tonight and talked to him about it and we will need to install a GES. Just trying to get all my eggs in order for the quote on this one.
chenley is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
2 ground rods MikeD NEC Code Forum 116 12-07-2009 12:38 PM
Ufer ground James Con General Electrical Discussion 14 12-04-2009 08:45 PM
Ground rod jbfan General Electrical Discussion 35 08-08-2008 04:03 PM
Counterposing Ground casparbrooke General Electrical Discussion 6 07-31-2008 07:50 PM
Equipment Ground Absolutetruthz General Electrical Discussion 6 06-06-2008 06:23 AM

Top of Page | View New Posts

All times are GMT -4. The time now is 02:08 AM.


Electrician Talk © 2006 - 2009 The Building Network LLC

Search Engine Optimization by vBSEO 3.2.0