Old 02-28-2018, 07:37 AM   #1
Senior Member
 
QMED's Avatar
 
Join Date: Sep 2016
Location: Seattle
Posts: 154
Rewards Points: 310
Default Time allowed for paralleling to Utility?

Is there a rule somewhere that says how long a generator is allowed to parallel to the utility? I'm thinking specifically about ships paralleling to shore power when shutting down onboard generators and transferring load to shore.

I figured this would be an NESC type of rule?
QMED is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 02-28-2018, 07:39 AM   #2
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 20,984
Rewards Points: 6,421
Default

I have no idea, but everything in my gut says that if there's a time limit, it's dumb. Why would a utility ever bark about free power?
QMED likes this.
__________________
One reason not to give DIY advice:
Catch a man a fish and you can sell it to him.
Teach a man to fish and you’ve ruined a good business opportunity.
MDShunk is offline   Reply With Quote
Old 02-28-2018, 07:47 AM   #3
Licensed Journeyman
 
nolabama's Avatar
 
Join Date: Oct 2007
Location: Greater New Orleans area
Posts: 5,880
Rewards Points: 2,028
Default Call POCO

It's going to be a local power company regulation if so. X2 on its dumb if so.

We are allowed to tie our co-gen plant into the substation for any length of time. We do have to call our local power company and tell them we are doing this. I am pretty sure their backroom - or whatever its called - makes a note of this.
brian john and QMED like this.
__________________
“Dammit, Smithers, this isn’t rocket science, it’s brain surgery!”
nolabama is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 02-28-2018, 08:01 AM   #4
Wire Ninja
 
MDShunk's Avatar
 
Join Date: Jan 2007
Location: Beautiful Cumberland Valley, in PA
Posts: 20,984
Rewards Points: 6,421
Default

I can see the shipping company or the shipyard having their own time limit, or maybe more like a goal. That would make more sense than the utility having a time limit.

I worked at a place for a spell that got a little bit of a power discount if the utility could start our generators remotely during peak time. They were indoor generators and it would scare the crap out of me sometimes if they just started up when I was near them. Black magic.
nolabama likes this.
__________________
One reason not to give DIY advice:
Catch a man a fish and you can sell it to him.
Teach a man to fish and you’ve ruined a good business opportunity.

Last edited by MDShunk; 02-28-2018 at 08:04 AM.
MDShunk is offline   Reply With Quote
Old 02-28-2018, 08:13 AM   #5
Senior Member
 
QMED's Avatar
 
Join Date: Sep 2016
Location: Seattle
Posts: 154
Rewards Points: 310
Default

Quote:
Originally Posted by MDShunk View Post
I can see the shipping company or the shipyard having their own time limit, or maybe more like a goal. That would make more sense than the utility having a time limit.

I worked at a place for a spell that got a little bit of a power discount if the utility could start our generators remotely during peak time. They were indoor generators and it would scare the crap out of me sometimes if they just started up when I was near them. Black magic.
That's hilarious same thing happened to me the other day when I was working on a generator space heater. Engine next to me started up and I got a nice blast of oil mist from the air starter.

Yeah there are time limits programmed in. 15 seconds is what we have now. The power management system parallels and unloads but 15 seconds and the generator breaker opens
QMED is offline   Reply With Quote
Old 02-28-2018, 08:13 AM   #6
Modérateur
 
frenchelectrican's Avatar
 
Join Date: Mar 2007
Location: Philippines
Posts: 8,693
Rewards Points: 21,898
Default

Quote:
Originally Posted by QMED View Post
Is there a rule somewhere that says how long a generator is allowed to parallel to the utility? I'm thinking specifically about ships paralleling to shore power when shutting down onboard generators and transferring load to shore.

I figured this would be an NESC type of rule?
It depending on the POCO regulations reguarding using ship generators paralleling to the utility source.

some will say unlimited time but some say just for a short time all it depending on the grid set up and what the POCO got on their side. ( most case typically less than a minuite )

but for smaller ships they do have open translation from ship generator to shore source however .,, the larger ship and smaller ships do have sychronous control to handle the correct phase sequice and HZ due most forgein ships do typically use 50 HZ system and others use 60 HZ setting.
few do have dual setting but that is kinda rare.
__________________
Bleu est beau.
frenchelectrican is offline   Reply With Quote
Old 02-28-2018, 08:14 AM   #7
Coffee drinking member
 
Wirenuting's Avatar
 
Join Date: Sep 2010
Location: Ceti Alpha V
Posts: 13,002
Rewards Points: 7,604
Default

It depends.
If it’s a civilian ship then it’s as per the yards utility agreements.
If it’s a gov then it’s based on the needs of the ship.
__________________
Teacher, my brain is full... Can I go home now?
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Wirenuting is offline   Reply With Quote
Old 03-11-2018, 01:33 PM   #8
Member
 
Trailboss's Avatar
 
Join Date: Mar 2018
Location: South East Massachusettes
Posts: 39
Rewards Points: 78
Default

Worked on shore based floating fish processing ship, had to run our generators for production because of issues between the state pier and the power company in getting us a bigger feed. That was back in 2007 when diesel prices were very high.
QMED likes this.
Trailboss is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Switch Time clock to Orbit Sprinkler Timer The_notorious_Rookie Residential Electrical Forum 21 08-23-2016 10:33 AM
Parallel phasing -- perfect every time telsa General Electrical Discussion 22 08-01-2016 05:55 AM
Not feasible or necessary at this time... Jhellwig Workplace Safety 27 05-26-2016 12:40 PM


All times are GMT -4. The time now is 04:14 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2020, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com