Old 12-08-2019, 06:44 PM   #1
Senior Member
 
Join Date: Mar 2015
Location: Houston Texas
Posts: 612
Rewards Points: 42
Default Bonding and Troubleshooting question

This is a made up scenario, trying to learn! So I'm shutting down a main panel to swap it out for a new one. The main panel feeds a sub-panel that the customer wants to run temporary power to during the shut down. Customer supplies the temporary generator + an SO cord to feed it. SO cord has 4 wires. Generator automatically bonds the neutral and ground. I run 3 hots and a neutral out to the Sub panel, no ground... The neutral and ground is obviously not bonded in the sub-panel. I take off the existing 3 hots and neutral in the sub panel and land the ones coming from the generator.

Question is, it is okay to bond the neutral and ground at the sub panel? This will fix any voltages from going haywire? It is technically okay to not run a 5 wire SO cord? Or will voltages be out of wack. When will voltages be out of wack?

Last edited by JasonCo; 12-08-2019 at 06:51 PM.
JasonCo is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 12-08-2019, 06:51 PM   #2
No Longer Here
 
Join Date: Oct 2009
Location: N/A
Posts: 39,206
Rewards Points: 578
Default

This is perfectly fine to do. You are essentially creating a new service, so bonding the neutral to ground inside of that panel is proper. After all, it is now the main panel during this temporary scenario.

Having neutral bonded to ground in the generator is fine as well. It’s the same as having neutral bonded to ground at the transformer on the pole. Remember, you only have the hots and neutral coming from the transformer in a normal utility fed situation. So that is what your scenario with the generator will be mimicking.
HackWork is offline   Reply With Quote
The Following User Says Thank You to HackWork For This Useful Post:
JasonCo (12-08-2019)
Old 12-08-2019, 07:07 PM   #3
Senior Member
 
Bird dog's Avatar
 
Join Date: Oct 2015
Location: South East US
Posts: 6,740
Rewards Points: 184
Default

Just don't forget the ground rod, bond to metal water pipe & metal building frame.
Gnome likes this.
__________________
EARTH FIRST! We'll strip-mine the other planets later.
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Popcorn munching forum observer
"The supreme art of war is to subdue the enemy without fighting." Sun Tzu
Bird dog is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 12-08-2019, 07:19 PM   #4
Senior Member
 
Join Date: Mar 2015
Location: Houston Texas
Posts: 612
Rewards Points: 42
Default

Thanks for the help. @Bird dog, yeah I guess if it's a sub-panel being fed off of a transformer then technically there should already be a grounding electrode of some sort. But can't always assume haha
JasonCo is offline   Reply With Quote
Old 12-08-2019, 07:39 PM   #5
Senior Member
 
brian john's Avatar
 
Join Date: Mar 2007
Location: Gilbert's Corner VA
Posts: 31,130
Rewards Points: 36
Default

If the neutral in the generator is bonded, make sure the water pipe is bonded and screw the ground rod.

The voltages WILL NEVER BE OUT OF WACK when referneced to each phase and neutral they will be out of wack compared to the ground IF the neutral and ground are not bonded somewhere.
__________________
Ah, but I was so much older then, I'm younger than that now
brian john is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



All times are GMT -4. The time now is 10:57 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2020, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com