Rewards Points: 386
Default Engineers

Spent half the afternoon trying to convince an engineer that he forgot the GEC for a water main in a tenant space and how I could convert the EGC of the main panel to a GEC and send it back to the meter bank. I just sent my coupe de tat email back to him, and its after 5pm, he hasn't responded. Letting a little thing like office hours get in the way of a heated discussion, just one more reason to gripe at them. Now i'm spoiling for a fight and no one to fight with. He closed his last email with this one "We like to use lots of acronyms and abbreviations to make sure architects stay confused about electrical work. It makes it seem a lot more complicated than it actually is." to us and the architect. So the question is do I throw a brick or a stick of rigid through his window, whats the preferred method of engineer disposal
Anathera is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 04-11-2018, 07:56 PM   #2
Senior Member
 
brian john's Avatar
 
Join Date: Mar 2007
Location: Gilbert's Corner VA
Posts: 29,976
Rewards Points: 1,724
Default

How far to the water pipe?
Why pick a fight?
He missed it and if you did not include it in your bid you missed it.
flyboy likes this.
__________________
Ah, but I was so much older then, I'm younger than that now
brian john is offline   Reply With Quote
Old 04-11-2018, 08:05 PM   #3
Senior Member
 
Join Date: Feb 2016
Location: North Carolina
Posts: 795
Rewards Points: 386
Default

200 some feet across a parking garage. Problem is he specd two parallel runs of 250al in a 3inch conduit if I go with the 3/0 GEC like he wants it runs my pipe fill up to 39% and I just don't want that hard a fight. I'd rather run the 1/0 CU GEC and save myself the pipe fill or run parallel 3/0 CU and 1/0 CU but he disappeared on me
Anathera is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 04-11-2018, 08:15 PM   #4
Senior Member
 
Join Date: Jun 2008
Location: Colleyville, Tx
Posts: 749
Rewards Points: 928
Default

Quote:
Originally Posted by brian john View Post
How far to the water pipe?
Why pick a fight?
He missed it and if you did not include it in your bid you missed it.
Exactly....and why are you communicating with the engineer directly and not through your GC?
cdslotz is offline   Reply With Quote
Old 04-11-2018, 08:22 PM   #5
Senior Member
 
Join Date: Feb 2016
Location: North Carolina
Posts: 795
Rewards Points: 386
Default

Because the Gc doesn't know what I'm talking about, for some reason the architect is acting as the project manager and is also out of his league so Engineer here I come. GC and architect are both in the email thread but the customer hired the engineer and architect and appliance contractor and the gc brought us, the plumber and the framers. Its a cluster
Anathera is offline   Reply With Quote
Old 04-11-2018, 08:37 PM   #6
Gold Pliers Champion
 
Signal1's Avatar
 
Join Date: Feb 2016
Location: Boston Area
Posts: 2,332
Rewards Points: 2,234
Default

Get used to it.

And don't let it get to you.
flyboy likes this.
Signal1 is offline   Reply With Quote
Old 04-11-2018, 08:49 PM   #7
Senior Member
 
Join Date: Feb 2016
Location: North Carolina
Posts: 795
Rewards Points: 386
Default

At this point I find it kind of fun because we don't always get to do the calculations and such in the field. It was frusterating to me though because I was getting geared up for a good argument and he clocked out at 5 while I'm still itching for a fight, so i've been cruising around code discussions and being argumentative in the mean time
Anathera is offline   Reply With Quote
Old 04-11-2018, 09:52 PM   #8
Band Member
 
emtnut's Avatar
 
Join Date: Mar 2015
Location: Eastern Ontario
Posts: 5,966
Rewards Points: 1,510
Default

Maybe things are different up here, but if there are engineering drawings... anything missing is an extra (spelled- Cha-Ching)

An estimator that I've worked with was a genius at picking out what was missing, then come in low bid and charge large for the extras.

I guess in your case, comes down to what you bid on, and the wording. From what others are saying, sounds like it's in your court ???
splatz likes this.
__________________
_____________________________________
Your Mother was a hamster, and your father smells of Elderberries. ... Now go away, or I shall taunt you a second time
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
emtnut is offline   Reply With Quote
Old 04-12-2018, 07:03 AM   #9
Hackenschmidt
 
splatz's Avatar
 
Join Date: May 2015
Location: Parts Unknown
Posts: 8,698
Rewards Points: 42
Default

Quote:
Originally Posted by emtnut View Post
Maybe things are different up here, but if there are engineering drawings... anything missing is an extra (spelled- Cha-Ching)

An estimator that I've worked with was a genius at picking out what was missing, then come in low bid and charge large for the extras.

I guess in your case, comes down to what you bid on, and the wording. From what others are saying, sounds like it's in your court ???
I know people that follow dumb engineers around, bidding their jobs, like the seagulls follow fishing boats. Dumb engineers' mistakes leave a trail of change orders, which in their eyes is like leaving a trail of $100 bills.
emtnut likes this.
__________________
Everything Should Be Made as Simple as Possible, But Not Simpler
splatz is offline   Reply With Quote
Old 04-12-2018, 08:14 AM   #10
Small Potatoes
 
flyboy's Avatar
 
Join Date: Jun 2011
Location: North East and Treasure Coast Florida
Posts: 5,018
Rewards Points: 3,771
Default

Quote:
Originally Posted by Anathera View Post
At this point I find it kind of fun because we don't always get to do the calculations and such in the field. It was frusterating to me though because I was getting geared up for a good argument and he clocked out at 5 while I'm still itching for a fight, so i've been cruising around code discussions and being argumentative in the mean time
I used to be like that, then I took some anger management classes.

Now I'm just a mellow old man...
flyboy is offline   Reply With Quote
Old 04-12-2018, 09:13 AM   #11
Senior Member
 
Join Date: Jul 2007
Location: FL
Posts: 925
Rewards Points: 976
Default

Quote:
Originally Posted by Anathera View Post
Spent half the afternoon trying to convince an engineer that he forgot the GEC for a water main in a tenant space and how I could convert the EGC of the main panel to a GEC and send it back to the meter bank.
Just for clarification, is this a new service to the tenant space or is it a feeder from an existing service?

I don't understand why there would be an EGC going to a Main Panel from a meter bank

Roger
Roger is offline   Reply With Quote
Old 04-12-2018, 11:08 AM   #12
Senior Member
 
Join Date: Jun 2008
Location: Colleyville, Tx
Posts: 749
Rewards Points: 928
Default

Quote:
Originally Posted by Anathera View Post
At this point I find it kind of fun because we don't always get to do the calculations and such in the field. It was frusterating to me though because I was getting geared up for a good argument and he clocked out at 5 while I'm still itching for a fight, so i've been cruising around code discussions and being argumentative in the mean time
Let us know how being "itching to fight" and argumentative works out for you.

I sure hope you used the specified fittings on that 200' run.....lol
cdslotz is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
IEEE - Institute of Electrical and Electronic Engineers redhorse NEC Code Forum 2 02-21-2018 02:24 PM
Engineers doing electrical work drsparky General Electrical Discussion 8 01-09-2017 04:09 AM
Engineers doing electrical work MechanicalDVR General Electrical Discussion 55 03-20-2016 04:43 PM


All times are GMT -4. The time now is 06:56 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com