Old 12-27-2018, 09:12 AM   #21
Senior Member
 
HackWork's Avatar
 
Join Date: Oct 2009
Location: -
Posts: 31,424
Rewards Points: 1,875
Default

Quote:
Originally Posted by zac View Post
And you would have notched the joists too!
I've scene what goes on over in your neck of the words mr.
Exactly.

The customer would have been happier, I would have been happier, it's a win-win.

The only people who wouldn't be happy are some electrician on the interwebs who worry about etiquette more than profit and customer satisfaction.


ETA: I don't notch joists. I notch drywall under joists.

Last edited by HackWork; 12-27-2018 at 09:21 AM.
HackWork is offline   Reply With Quote
Join Contractor Talk

Join the #1 Electrician Forum Today - It's Totally Free!

ElectricianTalk.com - Are you a Professional Electrical Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for electricians to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that ElectricianTalk.com is a great community to join. Best of all it's totally free!

Join ElectricianTalk.com - Click Here JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ElectricianTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 12-27-2018, 09:19 AM   #22
Petulant Amateur
 
99cents's Avatar
 
Join Date: Aug 2012
Location: Perky Nipples, Canada
Posts: 19,922
Rewards Points: 10,209
Default

Quote:
Originally Posted by zac View Post
And you would have notched the joists too!
I've scene what goes on over in your neck of the words mr.

Sent from my SM-G950U using Tapatalk
Seems minor when you see a tinbasher drill an 8” hole in a joist.

Last edited by 99cents; 12-27-2018 at 09:24 AM.
99cents is online now   Reply With Quote
Old 12-27-2018, 11:02 AM   #23
Petulant Amateur
 
99cents's Avatar
 
Join Date: Aug 2012
Location: Perky Nipples, Canada
Posts: 19,922
Rewards Points: 10,209
Default

Quote:
Originally Posted by ElectricalArtist View Post
Can someone tell me where it says that it has to be piped all the way to the panel or if it doesn't can you tell me where it says it doesn't
Code books donít work that way. If youíre looking for rules telling you what not to do, you will have a difficult time. Besides that, like someone else said, the boss told you how he likes it, and itís compliant, so thatís how you do it.
J F Go likes this.
99cents is online now   Reply With Quote
Sponsored Links
Advertisement
 
Old 12-27-2018, 11:21 AM   #24
Hackenschmidt
 
splatz's Avatar
 
Join Date: May 2015
Location: Parts Unknown
Posts: 7,712
Rewards Points: 2,828
Default

Quote:
Originally Posted by 99cents View Post
He did say he was going to offset it, though.
It's going to shrink after he offsets it, it will be less hack but still hack.
__________________
Whatsoever thy hand findeth to do, do it with thy might;
for there is no work, nor device, nor knowledge, nor wisdom,
in the grave, whither thou goest.
splatz is offline   Reply With Quote
Old 12-27-2018, 11:37 AM   #25
Senior Member
 
Join Date: May 2015
Location: Sacramento, California
Posts: 13,548
Rewards Points: 25,344
Default

The twin panels are just to the left of a major structural element.

And, as ever, the original installation used all of the top entries.

So his boss wanted to come in from below... with the raceway running to the right of the right panel.

I don't like PVC indoors. I want the flexibility of kicking EMT to and fro.

A smaller, yet deep, NEMA1 can would be preferred.

Then it could be mounted semi-flush, with enough surface depth such that the raceway could enter neatly. Inside the stud bay, the deeper portion of the can would permit the conductors to pass straight up into the panel can.

The can-to-can penetration would be aligned by KO'ing them both at the same time... and tossing in a chase nipple.

For the typical spa: 3/4" EMT ==> 2 #6 ; 2 #10 would suffice.

That PVC looks fat. (1")
splatz likes this.
telsa is offline   Reply With Quote
Old 12-27-2018, 11:54 AM   #26
Moderator
 
John Valdes's Avatar
 
Join Date: May 2007
Location: South Carolina
Posts: 15,355
Rewards Points: 2,354
Default

Why the box?
John Valdes is offline   Reply With Quote
Old 12-27-2018, 11:58 AM   #27
Senior Member
 
Switched's Avatar
 
Join Date: Dec 2012
Location: California
Posts: 6,013
Rewards Points: 8,754
Default

@telsa I have never seen a spa unit that would allow you to undersize the neutral. 100% of every unit I have done has called for a specific size for all the wiring.

Also, depending upon the spa unit, many of the control panels now have 1" openings to them, so if you run a 3/4", now you're having to install reducing bushings and a bonding bushing to the end of the EMT, in a likely very very tight control panel.
Switched is offline   Reply With Quote
Old 12-27-2018, 12:44 PM   #28
Senior Member
 
sbrn33's Avatar
 
Join Date: Mar 2007
Location: middle america
Posts: 11,368
Rewards Points: 3,136
Default

I reduce the neutral all the time. All it is doing is some controls or at the very most a small pump motor.
MTW and telsa like this.
sbrn33 is offline   Reply With Quote
Old 12-27-2018, 01:08 PM   #29
Senior Member
 
Join Date: May 2015
Location: Sacramento, California
Posts: 13,548
Rewards Points: 25,344
Default

Quote:
Originally Posted by Switched View Post
@telsa I have never seen a spa unit that would allow you to undersize the neutral. 100% of every unit I have done has called for a specific size for all the wiring.

Also, depending upon the spa unit, many of the control panels now have 1" openings to them, so if you run a 3/4", now you're having to install reducing bushings and a bonding bushing to the end of the EMT, in a likely very very tight control panel.
It's my style to stay with 1" PVC out doors// underground and then transition to 3/4" EMT once I'm inside conditioned space -- to include an enclosed garage// basement.

I've never seen #6 specified for the neutral in a spa pack. But then, I haven't seen everything.
telsa is offline   Reply With Quote
Old 12-27-2018, 01:21 PM   #30
Petulant Amateur
 
99cents's Avatar
 
Join Date: Aug 2012
Location: Perky Nipples, Canada
Posts: 19,922
Rewards Points: 10,209
Default

Quote:
Originally Posted by John Valdes View Post
Why the box?
He said something about load shedding. I dunno, I guess thatís to disconnect the spa when the system switches to back up power.
99cents is online now   Reply With Quote
The Following User Says Thank You to 99cents For This Useful Post:
John Valdes (12-27-2018)
Old 12-27-2018, 01:47 PM   #31
Senior Member
 
Switched's Avatar
 
Join Date: Dec 2012
Location: California
Posts: 6,013
Rewards Points: 8,754
Default

This is typical of almost every spa I have ever encountered, usually #8 or #6 is called for. Here is the manual, page 29.

https://s3.amazonaws.com/prod-hotspr...m-60hz-int.pdf
Attached Thumbnails
Pipe for outside jacuzzi / spa-screen-shot-2018-12-27-10.46.27-am.png  

wildleg likes this.
Switched is offline   Reply With Quote
Old 12-27-2018, 02:12 PM   #32
Senior Member
 
Join Date: May 2015
Location: Sacramento, California
Posts: 13,548
Rewards Points: 25,344
Default

3 #8 & 1 #10 still puts me inside 3/4."

They'd go in slicker than snot.
telsa is offline   Reply With Quote
Old 12-27-2018, 02:13 PM   #33
Senior Member
 
Join Date: Mar 2007
Location: Kamloops BC
Posts: 1,853
Rewards Points: 2,874
Default

Quote:
Originally Posted by 99cents View Post
He did say he was going to offset it, though.

yeah I caught that after I posted didn't want to dirty delete

but that whole installation looks crappy lol
99cents likes this.
electricguy is offline   Reply With Quote
Old 12-27-2018, 03:08 PM   #34
Hackenschmidt
 
splatz's Avatar
 
Join Date: May 2015
Location: Parts Unknown
Posts: 7,712
Rewards Points: 2,828
Default

I bet you could have your cake and eat it too, you can go up to four #6 THHN/THWN in 3/4" EMT, transition to 1" PVC inside, run 3/4" EMT from the panel to a box on the inside of the wall, and run 1" PVC through the wall to a PVC LB outside and on to the spa panel.
__________________
Whatsoever thy hand findeth to do, do it with thy might;
for there is no work, nor device, nor knowledge, nor wisdom,
in the grave, whither thou goest.
splatz is offline   Reply With Quote
Old 12-27-2018, 03:21 PM   #35
Senior Member
 
Join Date: Mar 2010
Location: Welland, Ontario Canada
Posts: 1,871
Rewards Points: 3,460
Default

Apparently they don't have heat guns, boxes or blankets in NYC...

That could have been one nice continuous piece instead of looking like a plumber put some prefab 90* and a bunch of couplings together. Now the second part, does it meet code? I am guessing it probably does, but back to the previous post, if it is not how the boss told you to do it... start over... gives you a second chance to make it look nice too.

Cheers
John
zac likes this.
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Navyguy is offline   Reply With Quote
Old 12-27-2018, 03:48 PM   #36
Senior Member
 
HackWork's Avatar
 
Join Date: Oct 2009
Location: -
Posts: 31,424
Rewards Points: 1,875
Default

Quote:
Originally Posted by Navyguy View Post
Apparently they don't have heat guns, boxes or blankets in NYC...

That could have been one nice continuous piece instead of looking like a plumber put some prefab 90* and a bunch of couplings together. Now the second part, does it meet code? I am guessing it probably does, but back to the previous post, if it is not how the boss told you to do it... start over... gives you a second chance to make it look nice too.

Cheers
John
Heat bending PVC in a garage that is already filled with all kinds of crap, including bad pipe work and wires strung along the walls, is a giant waste of profit, IMO.

As I mentioned earlier, the homeowner won't know the difference, only the other electrician on the internet
Navyguy likes this.
HackWork is offline   Reply With Quote
Old 12-27-2018, 04:20 PM   #37
Senior Member
 
Join Date: Mar 2010
Location: Welland, Ontario Canada
Posts: 1,871
Rewards Points: 3,460
Default

Well as long as the other crap is not their previous work, it could be used as a good example of "quality work" for that higher margin. In the end I would not be so sure it would be that much different in price, but we bend a lot of PVC up here it is nothing for us.

You are right though, most people don't know good work from crap unless they are shown the difference.

In looking at the picture, I probably would have gone a different root anyway (but can't see the end so not sure if it would be any better)…

Instead of coming out the top of that JB, probably would have come out the side, 90* up the wall and rolled 90* along ceiling where the other pipe and wires are. Would have saved a fitting and trying to offset around all that other crap in a small space.

Don't know your rules about coming into that box with a romex, but if that is not allowed, could have used a piece of ENT to snake his way to the box. If he has a metal connector on the PVC box end of that romex, then he needs to bond the connector with a grounding bushing I would think.

Cheers
John
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Navyguy is offline   Reply With Quote
Old 12-27-2018, 05:35 PM   #38
Senior Member
 
Join Date: Feb 2009
Location: Canada
Posts: 5,129
Rewards Points: 7,520
Default

Quote:
Originally Posted by HackWork View Post
Heat bending PVC in a garage that is already filled with all kinds of crap, including bad pipe work and wires strung along the walls, is a giant waste of profit, IMO.

As I mentioned earlier, the homeowner won't know the difference, only the other electrician on the internet
I would have spent the time to make it look better, reguardless of how bad the existing wiring is, I canít help it.

One of the reasons why Iím not a contractor.
eddy current is offline   Reply With Quote
Old 12-27-2018, 05:51 PM   #39
Hackenschmidt
 
splatz's Avatar
 
Join Date: May 2015
Location: Parts Unknown
Posts: 7,712
Rewards Points: 2,828
Default

PVC is never pretty. It would be prettier if it was bent instead of cobbled together but it would still be ugly.

It would be so much easier and nicer to do with EMT.

The customer would care, they may miss the fine points with conduit but they do see the difference between a glued together pile of plastic parts and a shiny metal pipe custom fit to their home.

It will be especially easy to look good next to the ugly PVC that's already there.
__________________
Whatsoever thy hand findeth to do, do it with thy might;
for there is no work, nor device, nor knowledge, nor wisdom,
in the grave, whither thou goest.
splatz is offline   Reply With Quote
Old 12-27-2018, 05:57 PM   #40
Senior Member
 
HackWork's Avatar
 
Join Date: Oct 2009
Location: -
Posts: 31,424
Rewards Points: 1,875
Default

Quote:
Originally Posted by splatz View Post
PVC is never pretty. It would be prettier if it was bent instead of cobbled together but it would still be ugly.

It would be so much easier and nicer to do with EMT.

The customer would care, they may miss the fine points with conduit but they do see the difference between a glued together pile of plastic parts and a shiny metal pipe custom fit to their home.

It will be especially easy to look good next to the ugly PVC that's already there.
The customer would have liked a tiny little Romex cable tucked up against that conduit in the top corner much better.
HackWork is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Handle Extender for Pipe Wrench/OSHA zoltan Tools, Equipment and New Products 40 10-10-2018 09:33 PM
Pipe Derating Kevin_Essiambre Canadian Electrical Forum 19 09-05-2018 08:51 AM
Bonding gas pipe NDC Canadian Electrical Forum 22 06-06-2018 04:58 PM
Shot in the dark regarding pipe routing quarky2001 General Electrical Discussion 9 08-11-2017 10:29 PM
Gas Pipe Conference Table (Standards for concealed wiring) sparky158 General Electrical Discussion 1 03-24-2016 02:06 PM


All times are GMT -4. The time now is 01:31 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | HVACSite.com | PaintTalk.com | PlumbingZone.com | RoofingTalk.com