Electrician Talk banner

Discussions Showcase Albums Media Media Comments Tags

1-2 of 2 Results
  1. NEC Code Forum
    A couple of AHJ have told me that 250.104(B) allows the EGC, of the circuit used to power the furnace, to fulfill the gas pipe bonding requirement. However, I believe that CSST installed between the furnace and the gas pipe may introduce some issues here. But CSST is not my question. My...
  2. NEC Code Forum
    2008 NEC (We use this in Ventura CA) Article 250.104(B) says "...gas piping, that is likely to become energized shall be bonded to the service equipment enclosure, the grounded conductor at the service, the grounding electrode conductor where of sufficient size, or the one or more grounding...
1-2 of 2 Results
Top