Canadian Electrical Forum
Boss told me to order #2/3 AL NMD for a 100a sub panel feed from a 200a main panel for the upstairs suite. (Sub feed landed on a 2P100a CHOM breaker in the main with the sub panel having it’s own 100a main as well, also homeline).
my understanding of the CEC is if the equipment is rated for...