  1. NEC Code Forum
    A new client installed an above ground pool last year with nothing done right. (done by others) Asked me to bring it up to code so he can get it inspected. He surrounded the pool 3' out with fist-size river rock at least 8" deep if not more. Do i need to get the perimeter bond wire 4-6" in the...
  2. NEC Code Forum
    (1) The pump was moved and the bonding (equipotential) wire was extended by splicing needed length. The splice is in the ground. Is it permissible and under what cisrumstances. (2) Whip to 3/4 HP was replaced and it has all #14 multistrand including ground. I believe the coed calls for min #12...