  1. Alternative Energy Forum
    Two Q's 1. For EV charger loads only, does the panelboard need to be sized for the sum of the continuous duty loads (i.e. number of chargers x charger amps) or the sum of the OCPD for those EV chargers? 2. For EV charger loads only, if a performance meter socket is used to measure consumption...
  2. Residential Electrical Forum
    I have completed a load calculation for a customer, and there is a large difference between the minimum required service under the two different methods. He has a 200 Amp rated panel with a 175 A main breaker. We are trying to figure out if it will be possible to add two 50 amp circuits to his...