  1. Canadian Electrical Forum
    We have a requirement to find a "2-stage" junction box, meaning the first section of the junction box is flush mounted in formwork and cast inside the barrier of a bridge. The second section is essentially an extension to the JB to bring it outside of the barrier and allow for a conduit entry...
  2. General Electrical Discussion
    I am wondering people's thoughts on the effect Power over Ethernet will have on electrical infrastructure, especially in lighting. What conduit/cable products will no longer be needed due to this? I assume some armored cabling will no longer be necessary if buildings switch their ceiling...