Electrician Talk banner
service grounding
1-1 of 1 Results
  1. Services and Service Equipment
    Inspection report was given on an apartment building with 400 amp disconnect feeding 8 gang meter cabinet array with 100 amp breakers built into meter cabinet. 1/0 Al SER leaves each breaker and feeds sub panels in each apartment. The inspector said each meter needs its own ground and that the...
1-1 of 1 Results
Top