    Looking for code compliant suggestions for transitioning from TECK 2/3 and 3/3 into multiple buildings. Current thoughts are as follows: Part 1 1) use wet rated TECK connector to an EMT LB then EMT into the building to the panel 2) sleeve the cable from 12 inches below grade to the LB...
  2. Residential Electrical Forum
    Hi There: Happy Memorial Day to all. First post, about a post! Going to ditch witch trench 36 inches to accommodate 2.5" conduit, seventy feet, box at street to side of house. Two elbows/sweeps maximum. That puts it at footer, which stick out about a foot past outside wall. Panel mounted...