I am trying to figure out if I can run 2 X 200A sub feeders in the same 4" PVC underground conduit.
NEC 310 is not clear to me. Am I allowed to run the conductors in the same conduit.
There is a new 1P 600A standup going in and the home owner has previously ran with this remodel in mind a 4" conduit from the new switchgear to the sub panel locations. Can I run the conductors in parallel assuming a separate neutral and ground for each sub panel or do I need 2 separate conduits?