Joined
·
16 Posts
Trying to wrap my head around this one...
When calc voltage drop, should I always use the available load (rated panel) or just use my calc load - what I'm gonna install. I've gotten into with electrical engineers before.
What do you guys/girls think?
When calc voltage drop, should I always use the available load (rated panel) or just use my calc load - what I'm gonna install. I've gotten into with electrical engineers before.
What do you guys/girls think?