Hi All,
I'm looking for some advice on an installation that I will be doing on a house that will have a basement suite, the basement will have its own meter and main panel and the upstairs will have its own meter and main panel
I will be installing a duplex meter base with one 200amp service feeding it (4/0 AL service conductors out of the mast).
Using the CEC my questions are:
can the meters feed 150amp panels each? (ie. 150 amp panel off of meter A for upstairs and a 150 amp panel off of meter B for the basement suite, the demand factor for each dwelling comes to just under 100 amps each)
Seeing the each of the two neutrals need to be grounded, can the grounding of the neutrals from each of the two main disconnects be attached to the same ground plate?
Cheers. Lee.
I'm looking for some advice on an installation that I will be doing on a house that will have a basement suite, the basement will have its own meter and main panel and the upstairs will have its own meter and main panel
I will be installing a duplex meter base with one 200amp service feeding it (4/0 AL service conductors out of the mast).
Using the CEC my questions are:
can the meters feed 150amp panels each? (ie. 150 amp panel off of meter A for upstairs and a 150 amp panel off of meter B for the basement suite, the demand factor for each dwelling comes to just under 100 amps each)
Seeing the each of the two neutrals need to be grounded, can the grounding of the neutrals from each of the two main disconnects be attached to the same ground plate?
Cheers. Lee.