First post, long time lurker, a wealth of knowledge here. Anyway, another guy at work recently finished a project where the engineers had him feed a panel with a potential transformer (could have been a CT, can't remember). The gist of it is, 15kv cable, a PT, and a 100A panel with a few single phase 15A loads. Has anyone ever heard of this? Is it legal? I've heard of the guys using springs near transmission lines on the reservations, but never seen anything like this?
First time I've heard of it.:)

Welcome aboard...:thumbsup:
 