Joined
·
809 Posts
I had the same problem with the builder i was working with. They didnt know how to tell the homeowner no or that extras and changes add to the length of tbe job so they told me i just needed to hire more guys and work longer days so they could stay on schedule. The homeowners would come in daily and say why isnt it do e whats taking so long and in the same breath tell me to move this or add that.