Joined
·
2,383 Posts
Yes.Magnettica said:Is any part of the lightning protection system required to be attached to GEC?
They usually check and document we have everything bonded also. Water, steel, sprinkler, etc.
Yes.Magnettica said:Is any part of the lightning protection system required to be attached to GEC?