Electrician Talk banner
1 - 1 of 1 Posts

·
Registered
Joined
·
486 Posts
Discussion Starter · #1 ·
We are working on a design build job that includes a 700' 13.8KV pole line.

We do not need a neutral at the site - but I am wondering if we need a ground wire run with the overhead line or if we can just drive a ground rod at every pole?
 
1 - 1 of 1 Posts
Top