Six.
yeehawTen is correct. Six42 watt cfl's each. 10 circuits.
Your free heavily used brooks electric shirt is in the mail.
surface mounted ? I'm assuming this a Reno to an existing school ?Bkessler said:Ten is correct. Six42 watt cfl's each. 10 circuits. Your free heavily used brooks electric shirt is in the mail.
Nope. California DSA jibs will no longer allow electrical conduit in block walls. All government jobs in California are going this way. The sad things is they added camera's and security after we were done. Looks like ****. I know.drumnut08 said:surface mounted ? I'm assuming this a Reno to an existing school ?
That's just awesome. What voltage? I sure hope it's 277; those switches might almost be carrying an amp. :laughing:Ten is correct. Six 42 watt cfl's each. 10 circuits...
oh no. more mwbc's. I just know it. I can smell em. call the mwbc police !Ten is correct. Six42 watt cfl's each. 10 circuits.
Your free heavily used brooks electric shirt is in the mail.
Big John said:That's just awesome. What voltage? I sure hope it's 277; those switches might almost be carrying an amp. :laughing:
We don't argue with the prints unless it's physics or code violation.rrolleston said:Why not use a contactor and sub panel and put all those lights on one switch.
Two whole amps per circuit? Stand the f**k back!120. There is no 277 in the school at all.