I have a GC wanting me to run my home runs in EMT. I keep telling him I can use MC cable and it will save time and money. The GC seems to not wanna entertain this idea.

anybody have any good arguments besides time, money and MC is still code acceptable?
 

· Registered
Joined
·
16 Posts
Discussion Starter · #3 ·
We adjusted our price up $80,000 for the project. Its a 150 unit hotel.


I probably did not go up enough but i'll make it up elsewhere.

GC also wanted me to run all LV in ENT back to the panel and I drew a line in the sand on that one. It is more trouble than its worth. ive done it before and I said never again.
 

· Registered
Joined
·
64 Posts
Not much else to offer on the argument for the MC VE besides what you listed.
Maybe send something explaining how many extra days it will add to his schedule and the extra cost to run EMT homeruns vs. MC you had to pass on.

If he is willing to pay - run some 1" and stick as much as you can it by code.
 

· Registered
Joined
·
16 Posts
Discussion Starter · #5 ·
Its gonna take longer but since the price has moved up I'm ok with it. I dont have too many good pipe men but I can get some for this size of job. Ive done over 200 motels so this one wont be a problem. It just sucks the owner and GC wont let me do it an easier and cheaper way. My bottom line wont change much but ill have more time and money in it.

but what do you do. They have the job and the cash.
 

· Registered
Joined
·
23 Posts
If the GC is going to pay for it than run EMT and charge him for it. Although, the GC does not really make the call on this one. You should have a contract that states your installation material. Unless you have been given specs from the engineer or the architect to install EMT you are only obligated to meet code.
 

· Registered
Joined
·
479 Posts
Quote doing it in EMT and add another page showing the proposed MC price.

Either way you make money, so who cares, I'd wire a house in RMC if the customer wanted it and was willing to pay. :)

Lol wait till you deal with an audiophile who wants their house rewired... $$$
 

· Registered
Joined
·
8,009 Posts
Sounds like this gc knows his stuff. Probably had a job done completely in weasel wire at some point and it screwed them. Maybe they care more about future expansions and the benefits of a raceway system over how fast you can slam mc up
 

· Registered
Joined
·
3,621 Posts
Maybe they care more about future expansions
I'd say you have much more flexibility with EMT if you ever need to add anything in the future
Both good points, but unless youre getting paid to plan for the future, you are wasting money putting it in.
 