That is correct.Hi all,
the picture is the panel in my basement. No idea how much is the capacity. 100*2=200A, or it is just 100A. The maker of the panel is siemens.
Sorry, the pictures are in level 3. 100 Amper or 200 Amper?That is correct.
So is the picture.