August 25, 2008
LIPA
1650 Brentwood Road
Brentwood, N.Y. 11717
REF. # T100744526
NEW BUILDING #1 - Six (6) 200 amp. Single Phase Services with 600 amp. Disconnect Switch - TOTAL LOAD 25KW.
NEW BUILDING #2 - Ten (10) 100 amp. Single Phase Services with 600 amp. Disconnect Switch - TOTAL LOAD 25KW.
EXISTING BUILDING #3 - Eleven (11) 100 amp. Single Phase Services with 600 amp. Disconnect Switch - TOTAL LOAD 25KW.