2 400 amp 208v main lug 3 phase panels....1 200 amp 240v panel and 1 100 amp panel...... each need to be on its own meter..... what steps do i need to take first??? contact local power company? will they bring individual feeds down for each meter???
 

·
RIP 1959-2015
Joined
·
10,750 Posts
2 400 amp 208v main lug 3 phase panels....1 200 amp 240v panel and 1 100 amp panel...... each need to be on its own meter..... what steps do i need to take first??? contact local power company? will they bring individual feeds down for each meter???
Yes, you will need to get their book on what they will require...


Welcome to ET.....:thumbsup:
 

·
Registered
Joined
·
12,167 Posts
You probably won't be able to get by with MLO panels though.

Does this job require engineer stamped drawings (for permitting)?
 