Joined
·
15,896 Posts
Is it acceptable by code to run (pass thru) one ATS to another with non fused mains from meter pan ?
Is it acceptable to run genny feed thru panel to outside ATS ?
House has 12" poured cement walls, this method would only require two cored holes and look cleaner without troughs.
Is it acceptable to run genny feed thru panel to outside ATS ?
House has 12" poured cement walls, this method would only require two cored holes and look cleaner without troughs.