First off, if the inspector wants to be taken seriously, she needs to communicate in a professional manner. That was not done. Second, a code section, article should be listed. She has failed the inspection process. I believe you need to have one service disconnect per enclosure. Get rid of the MLO panel or put in a backfeed breaker that can be bolted down.