Auth to connect where they place the OK sticker on the meter can?

I'm no Canuk but that's what I'd guess it is.
 

·
Registered
Electrical contractor 37 years. Electrical inspector 2 years
Joined
·
1,781 Posts
Final electrical inspection. Pre final is rough electrical inspection or it could be it passed inspection with certain conditions to be finished.
 

·
Registered
36th year apprentice & Floor Sweeper
Joined
·
1,584 Posts
Maybe pre-final is a progressive final inspection? Some jobs get a final inspection for weeks before the final sign off.
 

·
Super Moderator
Joined
·
7,517 Posts
Can't speak for today but 25 years ago in this town you'd need an inspection to get the OK sticker on the meter can, then the POCO connects power, then we come back for final electrical.
Seems if another jurisdiction is doing that, prefinal would be apt term to use.
 