Whats code on the lenth and procedures to the panel after the meter.
I am moving the meter over 6 feet (overhead service), panels in basement (right under existing meter) I need to come out of the bottom of the meter and run down low about 6 or 7 feet bofore going back inside. Maybe in some PVC ??
 

·
Electrical Simpleton
Joined
·
3,350 Posts
If the SE is subject to physical damage then schedule 80 PVC could be used for protection.

If the SE isn't subject to physical damage you could literally wrap the house with it without the need for any piping or other protection method.

Best check with your AHJ. Some areas have ammended rules that require more than what the NEC mandates.