Electrician Talk banner
1 - 1 of 1 Posts

·
Flat Broke...
Joined
·
63 Posts
Discussion Starter · #1 ·
Whats code on the lenth and procedures to the panel after the meter.
I am moving the meter over 6 feet (overhead service), panels in basement (right under existing meter) I need to come out of the bottom of the meter and run down low about 6 or 7 feet bofore going back inside. Maybe in some PVC ??
 
1 - 1 of 1 Posts
Top