Hi
I am assessing the existing 600a 3 phase 240v delta service in an shop
To we there is room for addition
Looking the utility bills that say 120 kW or 300A @ 240v 3ph maximum demand worst case
If Each leg at overhead(service drop) draws 100A assuming all legs balanced
Than I have big room for new loads
New load : 600A @240v 3 ph. 200A on each leg
What is the real capacity?
Any room for adding 600a load??
A forum community dedicated to professional electricians, contractors, and apprentices for residential and commercial work. Come join the discussion about trade knowledge, tools, certifications, wiring, builds, scales, reviews, accessories, classifieds, and more!