Hello, I've recently started installing a 200A service in place of a 100A service. I need to feed my new panel off of the old panel for the time being until they power up the new 200A meter, but I only have two 10' sections of 100A service cable two run between the two panels. I was wondering if anyone could help me with the proper way of splicing the two temporary sections of 100A cable together.
 

· Registered
Joined
·
16,587 Posts
J & D Electric said:
Hello, I've recently started installing a 200A service in place of a 100A service. I need to feed my new panel off of the old panel for the time being until they power up the new 200A meter, but I only have two 10' sections of 100A service cable two run between the two panels. I was wondering if anyone could help me with the proper way of splicing the two temporary sections of 100A cable together.
H taps and tape?

 

· RIP 1959-2015
Joined
·
39,532 Posts
Hello, I've recently started installing a 200A service in place of a 100A service. I need to feed my new panel off of the old panel for the time being until they power up the new 200A meter, but I only have two 10' sections of 100A service cable two run between the two panels. I was wondering if anyone could help me with the proper way of splicing the two temporary sections of 100A cable together.

Welcome to the forum....:thumbup:
 

· Registered
Joined
·
15,886 Posts
I normally install the new 200 amp meter and new 200 amp panel. Then I temporarily mount the old 100 amp base right beside the new one. Use a short piece of the old service entrance to jump between the two. Then plug the old meter back in and let it run like that until the power company brings new meter. When they show they remove the old temporary meter and plug in new one.
 

· Registered
Joined
·
2 Posts
Discussion Starter · #10 ·
I normally install the new 200 amp meter and new 200 amp panel. Then I temporarily mount the old 100 amp base right beside the new one. Use a short piece of the old service entrance to jump between the two. Then plug the old meter back in and let it run like that until the power company brings new meter. When they show they remove the old temporary meter and plug in new one.
I would have done it like that but the panel also had to be relocated due to it being directly under a water pipe. Thanks for the suggestion though!
 

· Registered
Joined
·
1,542 Posts
If we were in a time machine heading back to 1994, I would agree with these guys.
Or split bolts and rubber tape in a 6x6 pvc box.








But, since it's 2014, this is the way to go.:thumbsup:
http://www.mrsupply.com/ilsco-insul...pbt-1-0.html?gclid=CMqByI7cgbwCFUWRfgoddn0ANg

These come in all sizes and are super easy to use they just have mechanical lugs on both sides
 

· Registered
Joined
·
707 Posts
I temporarily mount the old 100 amp base right beside the new one. Use a short piece of the old service entrance to jump between the two.
I'm trying to picture how you tie the old SE to the new meter box temporarily. I can only imagine to the bottom lugs along with the new conductors that are going to the new panel. Would that possibly get past an inspector, even as a temporary connection?
 

· Registered
Joined
·
15,886 Posts
I'm trying to picture how you tie the old SE to the new meter box temporarily. I can only imagine to the bottom lugs along with the new conductors that are going to the new panel. Would that possibly get past an inspector, even as a temporary connection?

You pictured it correctly.




just like that is what my poco wants
Same here
 

· Registered
Joined
·
1,491 Posts
like Mcclarry said here they want the temp. connection installed in a way so as the poco has to remove it to do their final connection. Me I usually run the old service cable through the new can either at the top or meter hole and split bolt it. Generally, though they have been slacking lately the POCOs here have a few day turn around so usually not a big deal.
 