Hello, I've recently started installing a 200A service in place of a 100A service. I need to feed my new panel off of the old panel for the time being until they power up the new 200A meter, but I only have two 10' sections of 100A service cable two run between the two panels. I was wondering if anyone could help me with the proper way of splicing the two temporary sections of 100A cable together.