I put up the same recycled Aerial Temp service that we have used for years the other day and the poco won't connect to it. Fine, I'll do what they want. WAIT, that is the problem.

The whole front yard is asphalt, and they want the TEMP pole 3' underground. They don't care that the driveway is asphalt. And in order to put it behind the house, there is only about 4' between the houses. So I'm not sure what they are thinking.

It's currently a temp service, supported on all sides by 2x8's, 12' mast, and upright supports to 6'.

This is for a 100a TEMP service (will probably be used for the next month for a fire job).

I do a decent amount of these under the same poco and never had issues in the past, but they were never on a driveway either. We always had soil to sink a partial pole.

My only other idea is using the original service entrance point and meter, then putting my temp outside panel off of that, which will eventually ahve to be all ripped out anyway because of fire damage to the wood behind it, making it a headache for everyone.

Suggestions other than holing out the middle of the driveway?
 

·
Registered
Joined
·
1,201 Posts
Discussion Starter · #3 ·
Service on the house still hooked up? Swing the triplex over yourself
Our temp service is right next to the original service. poco cut the triplex on both ends. I suggested them attaching the triplex to the house where it was originally was, and we will just connect to the temp, but no go. Makes no sense.

They won't allow it to be attached to any temp service not 3' in the ground, even though there is absolutely no load/stress on the temp service.
 

·
felonious smile.
Joined
·
15,934 Posts
Our temp service is right next to the original service. poco cut the triplex on both ends. I suggested them attaching the triplex to the house where it was originally was, and we will just connect to the temp, but no go. Makes no sense.

They won't allow it to be attached to any temp service not 3' in the ground, even though there is absolutely no load/stress on the temp service.
They won't attach to anything less than a class a pole around here. I've stuck temp services on triple 2x6s nailed into a 15' pole, trees, only by swinging the drop over myself.
 

·
Electrical Simpleton
Joined
·
3,350 Posts
The whole front yard is asphalt, and they want the TEMP pole 3' underground.
Ok.... you knock out a 6X6 or 12X12 hole in the asphalt and set the pole on the sub-grade. Tell them you used a post hole shovel.

How in the world will the POCO know if it's actually 3 feet deep? Especially after you brace the way you are going to do.

Once the job is done get a bag of asphalt patch compact it and collect payment.

Pete
 

·
Registered
Joined
·
1,201 Posts
Discussion Starter · #7 ·
Ok.... you knock out a 6X6 or 12X12 hole in the asphalt and set the pole on the sub-grade. Tell them you used a post hole shovel.

How in the world will the POCO know if it's actually 3 feet deep? Especially after you brace the way you are going to do.

Once the job is done get a bag of asphalt patch compact it and collect payment.

Pete
Honestly.....not a bad idea.
 

·
Registered
Joined
·
1,201 Posts
Discussion Starter · #11 ·
I will probably end up not getting power again. I was down there yet again today and considered doing the fake asphalt dig, but the poco is adamant about it being 100 percent blue book (aside from the 3' down on the main pole, the two diagonal supports would need to be driven in to the asphalt as well). So I passed on it. Obviously, the poco wants the blue book temp pole. And again, I'd have no problem with that if there were soil to mount on (not sure I even could do to the soil being frozen rock hard).

I replaced the fire damaged mast with new wire, connected triplex wire, new insulator on solid wood not effected by the fire, pulled out the cable to the basement panel from the meter, and mounted my outside panel next to the meter pan.

The old temp was already inspected by the township and passed,so now I guess a new inspection is needed for this setup and the poco already said that they want an inspection on the whole house before connecting to my outside temp power even though it feeds nothing in the house (but it uses the house mast). The inside of the house is completely charred though, nothing to inspect.

There is no winning on this one. Thanks for the suggestions anyway.
 

·
Registered
Joined
·
194 Posts
Sometimes in the quest for safety we have to do unsafe things.:(
What does that even mean??... I don't see any issue with his initial Temp setup, or his current setup... they are just busting balls apparently. He's doing a temp service to rewire the house, he relocates and now they want to inspect the house wiring? Waste of time but they want what they want.
 

·
animal lover /rat bastard
Joined
·
13,547 Posts
sometimes you gotta break a few eggs to make an omelet. Sorry, but I'm with the poco on this one. Why have a blue book if you aren't going to stick to it ? Why have a hazard ? The house already burnt down once, who wants to be on the hook for a half baked solution. The solution you ended up with seems best.
 

·
Premium Member
Joined
·
20,983 Posts
You sure you even need a temp for a month long job? Unless it's required by your contract with the owner, I'd just let the subs know that this is a job where they need to bring their generator along. Not sure about your area, but in my area every sub for just about anything has a generator, and it would be fairly normal to use it on short jobs. It's either that or bash a hole in the blacktop and plant the pole. Patch it later. I'm not sure this is something worth getting twisted up over.
 

·
Registered
Joined
·
1,297 Posts
You sure you even need a temp for a month long job? Unless it's required by your contract with the owner, I'd just let the subs know that this is a job where they need to bring their generator along. Not sure about your area, but in my area every sub for just about anything has a generator, and it would be fairly normal to use it on short jobs. It's either that or bash a hole in the blacktop and plant the pole. Patch it later. I'm not sure this is something worth getting twisted up over.

As I was reading this thread a generator was what came to mind, cheap & quick + no fees to the PoCo & AHJ for a temp service, at least that's the case around here.
 

·
Registered
Joined
·
2,428 Posts
I would just go ahead and dig up the asphalt were needs and patch later. Should only take a couple extra hours total. Not a big deal.
 

·
Registered
Joined
·
1,201 Posts
Discussion Starter · #20 · (Edited)
You sure you even need a temp for a month long job? Unless it's required by your contract with the owner, I'd just let the subs know that this is a job where they need to bring their generator along. Not sure about your area, but in my area every sub for just about anything has a generator, and it would be fairly normal to use it on short jobs. It's either that or bash a hole in the blacktop and plant the pole. Patch it later. I'm not sure this is something worth getting twisted up over.
1000000000000 percent positive.

The township didn't want generators running during certain hours (night and weekend). The company doing the restoration wanted to work nights and weekends (large company staffed 24/7 so hours are irrelevant work is work). They had a bunch of their own generators so it wouldn't have been a problem by any stretch.

They eventually allowed the mast on the house and temp panel attached to the outside of the house.

The house was demolished the other week. :laughing:
 