This is gonna be a can of worms.

2548 Views 21 Replies 16 Participants Last post by  aftershockews
Duplex.

One side is up and running with a tenant. HO tried to get power turned on for the other side.

AHJ wrote up.
1. Replace service riser
2. Replace meter can.
3. Repair ground rod connection.
4. Remove exposed romex and non 3R rated box.



:censored:
1 - 20 of 22 Posts

· Retired Account
Joined
·
39,616 Posts
Duplex.

One side is up and running with a tenant. HO tried to get power turned on for the other side.

AHJ wrote up.
1. Replace service riser
2. Replace meter can.
3. Repair ground rod connection.
4. Remove exposed romex and non 3R rated box.



:censored:
So use the AHJ as your 'stick' A~shock

~CS~
 

· Administrator
Retired EC
Joined
·
24,908 Posts
The only think I see that has me questioning is the conduit entering the panel about the buss. Why did you not just drop the pipe down and go in the KO given by the manufacturer. Did you use a sealing locknut? Otherwise it looks good.
 

· Rest In Peace
Joined
·
6,281 Posts
Discussion Starter · #20 ·
If I cared, I'd say something about:

A PVC upper strapped like chit
Not seeing the intersystem bonding bridge
The holes from the old straps not being caulked
bonding bridge goes in today. I did not quite finish yesterday. I have the exposed uf to still pipe into the panel. I will probably have to crawl under the house.
 