I'm guessing this is a job spec. I agree with you it is not an NEC requirement.
Pete
I'm guessing this is a job spec. I agree with you it is not an NEC requirement.I don't have a code book in front of me, but I thought concrete encased electrodes had to be of a certain size (3/8 or 1/2" maybe?) and have 20 linear feet within the concrete. Don't think you have to bond wire mesh.