I recently had a job inspected and all the old work was done quite sloppily. Specifically wires not stapled and running across across the joists. I failed inspection because of it and now am in the process of lengthening the old wires so I can staple them to the joists. I am wondering though is that specifically a code or just the inspectors subjective interpretation of neat work?