#1 ·
A recent job of a Deli I wired in EMT. The trough was the greatest way to make it into the panel. Plumber decided to run under it afterwards.
 
#4 ·
I ran all EMT and MC , mixed use building w/ the occasional rodent. Tenants friend came in after an ran some romex above the basement drop ceiling .
 
#12 ·
I left that job with what some would dislike or even call a violation but at the time we were in the 05 cycle. I ran one # 8 neutral in each conduit for 6 branch circuits. Should of placed a "Do Not Disturb" tag on the neutral splices. Hate to what would happen if someone does.