For those that do Arc Flash Studies,
I see labels on switchboards stating PPE Level lets say 40cal/cm2 on the Utility termination/CT Cabinet, the down stream of the Main they have the same rating.
Could it be possible downstream of the main CB/Fused Switch the level could be lower?
Is this because they only do a single set of calculations and use it for the complete switchboard.
I see labels on switchboards stating PPE Level lets say 40cal/cm2 on the Utility termination/CT Cabinet, the down stream of the Main they have the same rating.
Could it be possible downstream of the main CB/Fused Switch the level could be lower?
Is this because they only do a single set of calculations and use it for the complete switchboard.